Can general Contractor act as LEED Project Adminstrator?
posted by Ammar Yahia on
Is it possible for the general contractor to act as LEED Project administrator, the case we have here as the consultant in that Design-bid -Build Contract, is that ministry (owner) has assigned LEE
Reposting this from a v4
posted by Tristan Roberts on
Report Contents
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Omar Elrawy on
Concerning Upload IEQp2-5, it is required to upload a differential air pressure test report for each designated smoking room.
Duct Testing and Cleaning
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Ramon Ramos on
What is the criteria for triggering duct testing and cleaning reports for both plans?
Baseline Fan Power for ECM
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hi, I’m currently working on a pharmaceutical facility in Mexico where unregulated procces loads account for more tan 60% of the energy consumption.
Door arrest systems or free-swinging closers allowed?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Florian Schmidtchen on
Is it allowed to install additional door arrest systems or free-swinging closers to the self-closing doors, so that in case the occupant is able to keep the door open for a short period?
Value of sustainability criteria
CI-2009 MRc4:Recycled Contentposted by CHANTAL CARIUS on
I need to get the Value of sustainability criteria of one material (steel), can anyone tell me how to get it? is for Credit 2 MR
Option 1 - EPD compliance
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Carolyn Day on
I'm curious if this has become easier with time.
Credit Points
Healthcare-v4 IPc1:Integrative processposted by Christine Chow on
The Reference Guide shows 1-5 points are available for this credit under the Hospitality and Healthcare rating systems. Is it explained anywhere how the variation of points is awarded?
Group Approach for EAp2 & EAc1 certification
NC-2009 EAp2:Minimum Energy Performanceposted by soham babu on
The question is related to Group Approach when we input two building details in minimum energy performance calculator, out of two building one of the building will not achieve the energy cost savin