LEED v4
Healthcare
Integrative Process
Integrative process

Healthcare-v4 IPc1: Integrative process

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Beginning in pre-design and continuing throughout the design phases, identify and use opportunities to achieve synergies across disciplines and building systems described below. Use the analyses to inform the owner’s project requirements (OPR), basis of design (BOD), design documents, and construction documents.

Energy-Related Systems
Discovery:
Perform a preliminary “simple box” energy modeling analysis before the completion of schematic design that explores how to reduce energy loads in the building and accomplish related sustainability goals by questioning default assumptions. Assess at least two potential strategies associated with each of the following:
  • Site conditions. Assess shading, exterior lighting, hardscape, landscaping, and adjacent site conditions.
  • Massing and orientation. Assess massing and orientation affect HVAC sizing, energy consumption, lighting, and renewable energy opportunities.
  • Basic envelope attributes. Assess insulation values, window-to-wall ratios, glazing characteristics, shading, and window operability.
  • Lighting levels. Assess interior surface reflectance values and lighting levels in occupied spaces.
  • Thermal comfort ranges. Assess thermal comfort range options.
  • Plug and process load needs. Assess reducing plug and process loads through programmatic solutions (e.g., equipment and purchasing policies, layout options).
  • Programmatic and operational parameters. Assess multifunctioning spaces, operating schedules, space allotment per person, teleworking, reduction of building area, and anticipated operations and maintenance.
Implementation:
Document how the above analysis informed design and building form decisions in the project’s OPR and BOD and the eventual design of the project, including the following, as applicable:
  • Building and site program;
  • Building form and geometry;
  • Building envelope and façade treatments on different orientations;
  • Elimination and/or significant downsizing of building systems (e.g., HVAC, lighting, controls, Exterior materials, interior finishes, and functional program elements); and
  • Other systems.
AND
Water-Related Systems
Discovery:
Perform a preliminary water budget analysis before the completion of schematic design that explores how to reduce potable water loads in the building and accomplish related sustainability goals. Assess and estimate the project’s potential nonpotable water supply sources and water demand volumes, including the following:
  • Indoor water demand. Assess flow and flush fixture design case demand volumes, calculated in accordance with WE Prerequisite Indoor Water-Use Reduction.
  • Outdoor water demand. Assess landscape irrigation design case demand volume calculated in accordance with WE Credit Outdoor Water-Use Reduction.
  • Process water demand. Assess kitchen, laundry, cooling tower, and other equipment demand volumes, as applicable.
  • Supply sources. Assess all potential nonpotable water supply source volumes, such as on-site rainwater and graywater, municipally supplied nonpotable water, and HVAC equipment condensate.
Implementation:
Document how the above analysis informed building and site design decisions in the project’s OPR and BOD. Demonstrate how at least one on-site nonpotable water supply source was analyzed to reduce the burden on municipal supply or wastewater treatment systems by contributing to at least two of the water demand components listed above. Demonstrate how the analysis informed the design of the project, including the following, as applicable:
  • plumbing systems;
  • sewage conveyance and/or on-site treatment systems;
  • rainwater quantity and quality management systems;
  • landscaping, irrigation, and site elements;
  • roofing systems and/or building form and geometry; and
  • other systems.
See all forum discussions about this credit »

Frequently asked questions

This is the only credit in the IP credit category. Do all teams have to pursue it?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Do we have to adopt all strategies that improve energy or water performance based on the analysis?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

02/10/2017– Updated: 06/11/2020
Reference Guide Correction
Description of change:
100002192 - IPc1 Point Value for BD+C Healthcare/Hospitality

Change the point value for Hospitality and Healthcare to 1 point.

Inquiry:
Ruling:
Campus Applicable
Yes
Internationally Applicable:
Yes
01/07/2015– Updated: 01/07/2015
Rating System Correction
Description of change:
100002006

In the first paragraph replace the word "used" with "analyzed," so that the section reads:
Document how the above analysis informed building and site design decisions in the project’s OPR and BOD. Demonstrate how at least one on-site nonpotable water supply source was analyzed to reduce the burden on municipal supply or wastewater treatment systems by contributing to at least two of the water demand components listed above. Demonstrate how the analysis informed the design of the project, including the following, as applicable:

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
No
01/07/2015– Updated: 30/06/2015
Form Update
Description of change:
5000038

Under Water-Related Systems, changed "used" to "analyzed" so that text reads, "Explain how one on-site nonpotable water supply source was analyzed to reduce municipal supply or wastewater treatment for the demand components listed below."

Inquiry:
Ruling:
Campus Applicable
Yes
Internationally Applicable:
Yes
01/10/2014– Updated: 14/02/2015
Reference Guide Correction
Description of change:
100001937

Add the following sets of second-order bullets.

Under the first first-level bullet, after "as applicable," add:
o Building and site program
o Building form and geometry
o Building envelope and façade treatments on different orientations
o Elimination or significant downsizing of building systems (e.g., HVAC, lighting, controls, exterior materials, interior finishes, and functional program elements)
o Other systems

And under the third first-level bullet, after "as applicable," add:
o Plumbing systems
o Sewage conveyance and/or on-site treatment systems
o Rainwater quantity and quality management systems
o Landscaping, irrigation, and site elements
o Roofing systems and/or building form and geometry
o Other systems

Inquiry:
Ruling:
Campus Applicable
Yes
Internationally Applicable:
Yes
See all forum discussions about this credit »
Guest expert

Marcus Sheffer

7group / Energy Opportunities
LEED Fellow

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Requirements

Beginning in pre-design and continuing throughout the design phases, identify and use opportunities to achieve synergies across disciplines and building systems described below. Use the analyses to inform the owner’s project requirements (OPR), basis of design (BOD), design documents, and construction documents.

Energy-Related Systems
Discovery:
Perform a preliminary “simple box” energy modeling analysis before the completion of schematic design that explores how to reduce energy loads in the building and accomplish related sustainability goals by questioning default assumptions. Assess at least two potential strategies associated with each of the following:
  • Site conditions. Assess shading, exterior lighting, hardscape, landscaping, and adjacent site conditions.
  • Massing and orientation. Assess massing and orientation affect HVAC sizing, energy consumption, lighting, and renewable energy opportunities.
  • Basic envelope attributes. Assess insulation values, window-to-wall ratios, glazing characteristics, shading, and window operability.
  • Lighting levels. Assess interior surface reflectance values and lighting levels in occupied spaces.
  • Thermal comfort ranges. Assess thermal comfort range options.
  • Plug and process load needs. Assess reducing plug and process loads through programmatic solutions (e.g., equipment and purchasing policies, layout options).
  • Programmatic and operational parameters. Assess multifunctioning spaces, operating schedules, space allotment per person, teleworking, reduction of building area, and anticipated operations and maintenance.
Implementation:
Document how the above analysis informed design and building form decisions in the project’s OPR and BOD and the eventual design of the project, including the following, as applicable:
  • Building and site program;
  • Building form and geometry;
  • Building envelope and façade treatments on different orientations;
  • Elimination and/or significant downsizing of building systems (e.g., HVAC, lighting, controls, Exterior materials, interior finishes, and functional program elements); and
  • Other systems.
AND
Water-Related Systems
Discovery:
Perform a preliminary water budget analysis before the completion of schematic design that explores how to reduce potable water loads in the building and accomplish related sustainability goals. Assess and estimate the project’s potential nonpotable water supply sources and water demand volumes, including the following:
  • Indoor water demand. Assess flow and flush fixture design case demand volumes, calculated in accordance with WE Prerequisite Indoor Water-Use Reduction.
  • Outdoor water demand. Assess landscape irrigation design case demand volume calculated in accordance with WE Credit Outdoor Water-Use Reduction.
  • Process water demand. Assess kitchen, laundry, cooling tower, and other equipment demand volumes, as applicable.
  • Supply sources. Assess all potential nonpotable water supply source volumes, such as on-site rainwater and graywater, municipally supplied nonpotable water, and HVAC equipment condensate.
Implementation:
Document how the above analysis informed building and site design decisions in the project’s OPR and BOD. Demonstrate how at least one on-site nonpotable water supply source was analyzed to reduce the burden on municipal supply or wastewater treatment systems by contributing to at least two of the water demand components listed above. Demonstrate how the analysis informed the design of the project, including the following, as applicable:
  • plumbing systems;
  • sewage conveyance and/or on-site treatment systems;
  • rainwater quantity and quality management systems;
  • landscaping, irrigation, and site elements;
  • roofing systems and/or building form and geometry; and
  • other systems.
See all forum discussions about this credit »

Frequently asked questions

This is the only credit in the IP credit category. Do all teams have to pursue it?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Do we have to adopt all strategies that improve energy or water performance based on the analysis?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Frequently asked questions

This is the only credit in the IP credit category. Do all teams have to pursue it?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

Do we have to adopt all strategies that improve energy or water performance based on the analysis?

The answer to this question is available to LEEDuser premium members. Start a free trial »

(If you're already a premium member, log in here.)

See all forum discussions about this credit »

Addenda

02/10/2017– Updated: 06/11/2020
Reference Guide Correction
Description of change:
100002192 - IPc1 Point Value for BD+C Healthcare/Hospitality

Change the point value for Hospitality and Healthcare to 1 point.

Inquiry:
Ruling:
Campus Applicable
Yes
Internationally Applicable:
Yes
01/07/2015– Updated: 01/07/2015
Rating System Correction
Description of change:
100002006

In the first paragraph replace the word "used" with "analyzed," so that the section reads:
Document how the above analysis informed building and site design decisions in the project’s OPR and BOD. Demonstrate how at least one on-site nonpotable water supply source was analyzed to reduce the burden on municipal supply or wastewater treatment systems by contributing to at least two of the water demand components listed above. Demonstrate how the analysis informed the design of the project, including the following, as applicable:

Inquiry:
Ruling:
Campus Applicable
No
Internationally Applicable:
No
01/07/2015– Updated: 30/06/2015
Form Update
Description of change:
5000038

Under Water-Related Systems, changed "used" to "analyzed" so that text reads, "Explain how one on-site nonpotable water supply source was analyzed to reduce municipal supply or wastewater treatment for the demand components listed below."

Inquiry:
Ruling:
Campus Applicable
Yes
Internationally Applicable:
Yes
01/10/2014– Updated: 14/02/2015
Reference Guide Correction
Description of change:
100001937

Add the following sets of second-order bullets.

Under the first first-level bullet, after "as applicable," add:
o Building and site program
o Building form and geometry
o Building envelope and façade treatments on different orientations
o Elimination or significant downsizing of building systems (e.g., HVAC, lighting, controls, exterior materials, interior finishes, and functional program elements)
o Other systems

And under the third first-level bullet, after "as applicable," add:
o Plumbing systems
o Sewage conveyance and/or on-site treatment systems
o Rainwater quantity and quality management systems
o Landscaping, irrigation, and site elements
o Roofing systems and/or building form and geometry
o Other systems

Inquiry:
Ruling:
Campus Applicable
Yes
Internationally Applicable:
Yes
See all forum discussions about this credit »
Guest expert

Marcus Sheffer

7group / Energy Opportunities
LEED Fellow