Forum quick links
Alternative Complaince for large energy user
NC-v4 EAp2:Minimum energy performanceposted by Vipul Babriya on
Hello,
High-Reflectance Roof
NC-v4 SSc5:Heat island reductionposted by Cora Kenrick on
Hi Fellow LEED Users,
Am I correct in saying that for a High-Reflectance Roof, a roof full of PV can not be consider? As SRI works different with PV.
mindful Materials -- contractor working group participation request
posted by Jennifer Taranto on
Lauren Shumaker (Turner Construction) and I are starting a group to focus on improving the submittal process, currently focused specifically on healthy & sustainable materials and the use of th
Define "Weekend Trips
CS-v4 LTc5:Access to quality transitposted by Susan Di Giulio on
We are working on an Office Tower in the center of Salt Lake City.
foundation walls and footings
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by Ilana Judah on
How are these calculated for this credit? As a continuation of the exterior wall? Thanks.
Area not in scope of project
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Carl Rappa on
We have a renovation & addition project where the CM wants to do the Option 2: Air Testing to achieve IEQc3.2.
Requirements of section 5.4.3.4 of ASHRAE 90.1-2007
NC-2009 EAp2:Minimum energy performanceposted by Maurizio Sabatino Pirocchi on
Hi,
I have a question concerning requirements of section 5.4.3.4 of ASHRAE 90.1-2007.
U-values for mixed-use building
NC-2009 EAp2:Minimum energy performanceposted by Francesco Passerini on
For the baseline model relative to a building where a part is residential (4 floors) and another part nonresidential (ground floor), shall the envelope of the nonresidential part respect the U-valu
Option 2 - Inherently - back-up documentation?
NC-v4 EQc2:Low-emitting materialsposted by Erin Holdenried on
For factory-finished metal products and glazing, does one have to include supporting documentation?
Wet Applied Products Volume
NC-v4 EQc2:Low-emitting materialsposted by Tommy Linstroth on
The calculator USGBC provides for this credit make it appear that the volume is required for ALL products, regardless of if you are doing a budget or if projects all meet VOC limits.