Forum quick links
Overall Project transperancy solutions and the difficulty or concerns with certain materials (IMP)
NC-v4 MRc5:Construction and demolition waste managementposted by Olawale Taiwo on
Background Information:
Default materials cost
CS-2009 MRc4:Recycled Contentposted by Agnieszka Rylska on
LEED default materials cost is 45% of total construction costs (based on specific Master Format divisions).
Data Center Energy Modeling - Additional Energy Model
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Gopinath Vasu on
Hi All,
I have few doubts regarding energy modeling of data center which I have listed down below.
Compliance with 90.1 6.4.4.2.2?
CI-v4 EAp1:Fundamental commissioning and verificationposted by emily reese moody on
A question from my CxA that I can't find a response for in the Guide or elsewhere:
How is energy and waterconsumption data collected?
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Maria Perzon on
Hello,
Who (in the project organization) gets the notifications from USGBC to hand in the energy and water usage data (~Two times per year?)
Is previously agricultural used area considered disturbed?
NC-v4 SSc2:Site development - protect or restore habitatposted by Torokaisnen Eetu on
Hi everyone.
ID credit for modular construction
NC-2009 IDc1:Innovation in Designposted by Gail Napell on
Hi all
Design for Active Occupants in mixed-use building
NC-v4 INc1:Innovationposted by Emily Purcell on
I'm wondering if anyone has any insights into applying this credit to a building with distinct spaces/occupancies. A common building type we work with is an academic building adjoining a dorm.
Bar Space
CI-v4 EQc9:Acoustic performanceposted by Kevin Gilleran on
Hi. We are working on a TI within a shell building which will have a bar, seating, lounge area, kitchen prep areas with support spaces and its own restrooms. No office function etc.