Forum » CI-v4 EAc3
Topic

Water source heat pump with cooling tower and boiler

CI-v4 EAc3: Advanced Energy Metering
posted by Gaston Michaud on Oct 3, 2023, 4:51 pm

Hi all!

We have a project located in a building that provides a water loop for each tenant to connect its water source heat pump.  This loop includes cooling towers and boilers to maintain...

Last reply: Marcus Sheffer, Oct 4, 2023, 9:24 am

Cutsheet of Btu meter for chilled water metering

CI-v4 EAc3: Advanced Energy Metering
posted by Nagaraj Sankar on Sep 20, 2023, 6:30 am

Credit - Advanced Energy Metering

My project involves a water-cooled chiller, and we have already installed an Advanced Energy Meter for chilled water. We have a question: Is it...

Last reply: Marcus Sheffer, Sep 20, 2023, 9:02 am

Total Annual Consumption

CI-v4 EAc3: Advanced Energy Metering
posted by Deborah Stadler on Jun 26, 2020, 7:54 am

Our CI project is not doing an energy model, but using the prescriptive method (AEDG).  What is the acceptable way to determine the Total Annual Consumption to confirm uses above the 10% that...

Last reply: Marcus Sheffer, Mar 30, 2023, 11:24 am

DOASs provide outdoor air to more than one tenant

CI-v4 EAc3: Advanced Energy Metering
posted by CT G on Jul 12, 2021, 8:32 am

We're working on a project where the tenant occupies 2 floors in a 4 story-building. This building has DOAS units that supply OA to all 4 floors.

Should we include the energy metering of...

Last reply: Tyler Thumma, Jan 14, 2022, 2:42 pm

Fan Powered Box Metering Category

CI-v4 EAc3: Advanced Energy Metering
posted by Daniel Thien on Oct 4, 2021, 11:47 am

We have a building that uses fan-powered boxes with integral electric heaters to serve each zone.  The fan-powered boxes come from the manufacturer with one electrical connection point, and the...

Last reply: Tyler Thumma, Dec 15, 2021, 3:39 pm

Tenant floor sub metering

CI-v4 EAc3: Advanced Energy Metering
posted by R Jones on Sep 29, 2021, 5:04 pm

Hi - we have a multi level office building - the proposal is to have sub metering of energy uses to each floor ie- heating, chilled water for cooling but to sub meter lighting and receptacle...

Last reply: Marcus Sheffer, Oct 1, 2021, 6:47 pm

Advanced energy metering- specific qualifications

CI-v4 EAc3: Advanced Energy Metering
posted by Chad Dunbar on Aug 2, 2021, 7:58 pm

We have a 250k sf...

Last reply: Marcus Sheffer, Aug 3, 2021, 9:43 am

Advanced Energy Metering, Opt.2- Data Must Be Remotely Accessible

CI-v4 EAc3: Advanced Energy Metering
posted by Graeme Smith on Feb 18, 2021, 9:08 pm

We under that... "The data must be remotely accessible"... but how does USGBC define remote accessibility?

For example, if the power meter installed on level 1 transmits data to a central...

Last reply: Graeme Smith, Feb 22, 2021, 4:55 am

Meeting Option 2 Requirements

CI-v4 EAc3: Advanced Energy Metering
posted by Bonny Gray on May 11, 2019, 5:28 pm

Below are the construction review comments from our reviewer:

Option 2:  Advanced Metering

  1. It is unclear if the Table:  Advanced Meters includes all individual energy end-uses...

Last reply: Marcus Sheffer, Feb 24, 2020, 10:52 am

Partial renovation of owner-occupied building

CI-v4 EAc3: Advanced Energy Metering
posted by Dee Spiro on Jan 10, 2020, 1:33 pm

Our ID+C project is in a higher-ed campus building that houses the facilities team, their back-of-house workshop spaces and office areas for the FM team and various other associated departments...

Last reply: Dee Spiro, Jan 15, 2020, 1:55 pm