Hi - we have a multi level office building - the proposal is to have sub metering of energy uses to each floor ie- heating, chilled water for cooling but to sub meter lighting and receptacle loads together on a per floor basis  - together or separately these are expected to be >10% of the energy use on each floor  - is it accepted to sub meter lighting and receptacle plug loads together or do they have to be metered separately ? 

thank you