Log in
Forum » CI-v4 WEc1
Topic

Laboratory Sinks

CI-v4 WEc1: Indoor water use reduction
posted by Edgar Arevalo on May 9, 2024, 1:44 pm

I have a laboratory project where they will include sinks in the bio lab spaces.  How do we include this in the indoor water use calculator, would it be more like a kitchen faucet or public...

Last reply: Edgar Arevalo, May 11, 2024, 8:53 am

% of Male Occupants using restrooms with urinals when project also includes All-gender restrooms

CI-v4 WEc1: Indoor water use reduction
posted by Yarden Harari on Nov 10, 2023, 2:31 pm

Hi - we've received a comment on our water use calculations about changing the % of male occupants using restrooms with urinals because the project also includes several single occupant all-...

Last reply: Yarden Harari, Nov 13, 2023, 10:01 am

Calculated "annual nonportable water supply" for Commerical ID+C project

CI-v4 WEc1: Indoor water use reduction
posted by Thanh Nguyen on Oct 10, 2023, 2:45 am

Hi,

My project is located on a LEED certificated building. The building uses rain water to supply for irrigation and toilet flushing. How can I calculate the annual non-potable water...

Water Calcultion for Commerical ID+C project

CI-v4 WEc1: Indoor water use reduction
posted by Amgad Khattab on Aug 16, 2023, 7:51 am

We have a project with the following :

- Tenet space has not any WC [Toilets] in the tenet space. but they are using the WC in the core area.

Hint:

- the building containing...

Last reply: emily reese moody, Aug 17, 2023, 2:03 pm

Amenities space

CI-v4 WEc1: Indoor water use reduction
posted by Allen Cornett on Sep 26, 2021, 7:48 pm

I am working on a project that is a renovation and expansion of the amenity spaces in an existing office building.  The amenity spaces consist of a café with dining area, tenant lounge, meeting...

Last reply: emily reese moody, Sep 27, 2021, 2:41 pm

WaterSense label req for existing Base Building Fixtures?

CI-v4 WEc1: Indoor water use reduction
posted by RDK E&S on Dec 19, 2019, 10:31 am

Hello, 

I know to achieve WEc1, all fixtures serving the needs of the occupants must be included in the calculator. Are eligible existing (...

Last reply: Bipin Karki, Jan 15, 2020, 8:33 am

Rain Water Tank Base Building

CI-v4 WEc1: Indoor water use reduction
posted by Luis Carlos Perez Plazas on Jun 25, 2018, 9:07 pm

Hello

We have a Commercial Interior located in a Base Building which have a rain water collection tank. Water is treated and is used for irrigation and for urinals and toilets of the...

Last reply: ESD Engineer, Dec 11, 2018, 5:24 pm

Kitchen faucet for restaurant project

CI-v4 WEc1: Indoor water use reduction
posted by Borja Sánchez on Feb 8, 2018, 2:31 pm

Hi, we want to certify a restaurant and as described in the reference guide: commercial kitchen (food service) sinks and prep sinks, including pot filling sinks, wash-down, and cleaning sinks can...

Last reply: Suzanne Painter-Supplee, LEED AP+ID&C, Oct 16, 2018, 9:08 pm

make up water for cooling tower

CI-v4 WEc1: Indoor water use reduction
posted by Craig Flandermeyer on Aug 1, 2018, 2:05 pm

Working on a Interiors project that has maximized efficiency in the flush and flow fixtures; proposing a...

Last reply: emily reese moody, Oct 16, 2018, 7:43 pm

Recent toilets, old building

CI-v4 WEc1: Indoor water use reduction
posted by Erika Roy on Jun 21, 2018, 2:24 pm

Hello, 

We are working on a CI project that changed the toilets only few years ago with 6lpf. Less than 3 years.

We can not change only the tank of these toilets so we would have to...

Last reply: emily reese moody, Jun 26, 2018, 3:27 pm