Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Views exculsion for High Bay Window areas

Schools-2009 IEQc8.2:Daylight and Views—Views
posted by  David Sundersingh  on 

We are in the early stages of design for a Career Compact Center, this has 3 workshop areas with high bay windows for natural lighting.

1
Tue Apr 4, 2017, 5:37 pm

Multi-use project

Mid-Rise-v4 MPR2:Must use reasonable LEED boundaries
posted by  Vanessa Toralti  on 

We have a new LEED v4 Multifamily Midrise project (Homes), it’s several residential buildings on the same site.

1
Fri May 5, 2017, 5:45 pm

Combined Purchasing

EBOM-2009 MRp1:Sustainable Purchasing Policy
posted by  Ryan Hoffman  on 

The project in question is the north building of a 2-building, 1 million sf facility.

1
Mon Aug 28, 2017, 8:03 pm

project with complete demolition of the old building.

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Qian Tang  on 

Dear all, we have a project with a complete demolition of an old building on the project site then ditching for the new foundation. We are not sure if this credit is relevant to the demolition pr

1
Sat Aug 26, 2017, 8:54 pm

Connected underground car parks

NC-v4 LTc7:Reduced parking footprint
posted by  Florian Schmidtchen  on 

Dear all. We are working on a LEED v4 NC campus project in which two (office) buildings pursuing a LEED certification.

1
Sat Aug 26, 2017, 12:55 pm

Toilet Building meet MPR?

NC-v4 MPR3:Must comply with project size requirements
posted by  Harry Flamm  on 

Does a stand-alone one-story building, of 1,600 sf, that contains just public toilets and sinks in a park setting, and no full-time occupancy, meet minimum program requirements for LEED v4 New Cons

1
Wed Apr 5, 2017, 4:31 pm

Electronic equipment

CI-2009 MRc2:Construction Waste Management
posted by  Agnieszka Rylska  on 

Should electronic equipment be included in the waste calculations (should we monitor it's weight) or should it be only mentioned in the Construction waste management plan that it's exluded from the

1
Wed Apr 5, 2017, 3:21 pm

MRc4 Recycled Content Calculation

NC-2009 MRc4:Recycled Content
posted by  Jack Jennings  on 

Can Division 2 materials (hardscape, storm/sanitary utilities, landscaping) be excluded from the overall material cost when calculating for this credit?

1
Fri Apr 7, 2017, 1:08 am

Concrete Regional and Recyle Content

NC-2009 MRc5:Regional Materials
posted by  Rick Alfandre  on 

I'm trying to verify the appropriateness of our approach to concrete for MR 4 and 5. Using the Materials Calculator and Tracker form; Concrete - total cost is the cost of concrete delivered to th

1
Thu Jun 15, 2017, 3:24 pm

About Existing Building for Retail

EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  Esteban Martinez  on 

Hello, we are working on a existing building retail project, which has 43720.42ft2 and 31.16ft height with CO2 concentrations between 500 and 600 ppm.

1
Thu Aug 31, 2017, 11:44 pm