We have a VAV system where single AHUs serve multiple zones. Do we need to take outside air measurements at each VAV box?

Our building has a single fan that supplies outside air to multiple AHUs. Do we need to perform outside air testing at the supply fan or at all AHUs?

What if our systems do not meet the required outside air when systems are tested at worst-case conditions?

What if after our Preliminary Review we have to revise the ventilation rate procedure calculations and find that we need to make corrections to the system in order to meet the prerequisite? Can we redo the outside air testing after making corrections? Wou

My building has 80 AHUs providing ventilation to building spaces. Do I have to do the ventilation calculations and conduct outdoor air measurements for each one?

Our system cannot provide enough outdoor air to meet ASHRAE 62.1-2010 due to design limitations. How much outdoor air must we provide to meet Case 2 instead?

The outdoor air intake for our ventilation system is not accessible, and it’s not possible to measure the outdoor airflow directly. How can we determine the outdoor airflow for this system?

How do I find whether my project is located in a non-attainment area for particulate matter or exceeds the prerequisite ozone requirements?

What happened to the IEQ Space Matrix that was available to version 2009 projects? What should I reference to determine how spaces in my building should be categorized for this prerequisite?

View answers »

Forum discussion

EBOM-v4 EQp1:Minimum indoor air quality performance

About Existing Building for Retail

Hello, we are working on a existing building retail project, which has 43720.42ft2 and 31.16ft height with CO2 concentrations between 500 and 600 ppm. I would like to know if we can document this credit with natural ventilation only, and without having the prescription method of ashrae. Thanks!

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 08/31/2017 - 23:44

There is a pilot credit to demonstrate compliance via an IAQ procedure. This includes taking measurements and meeting minimum standards for IAQ contaminants but CO2 concentrations are only one of many contaminants of concern that must be measured. Otherwise, you would need to follow the typical prerequisite requirements for naturally ventilated buildings.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.