Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Open Floor Plan with different Tvis Values

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Marisa Britton  on 

Can I do prescriptive method of calculation for an open floor plan if the N+W glazing walls of the building have a Tvis of 38% and the South + East glazing walls have a Tvis of 56%?

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Apr 16, 2015, 6:24 pm

Future Expansion

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Karl Heitman  on 

Our project, an industrial manufacturing facility, is expecting future expansion, and it has been noted on our permit/construction drawings.

2
Default Avatar
President
Heitman Architects Inc
LEEDuser Premium Member
4 thumbs up
Thu Apr 16, 2015, 4:45 pm

VERTICALLY ATTACHED BUILDINGS

LEED Guidance for Campuses and Multiple Buildings
posted by  Vincent Dupuy  on 

Hello, I work on a building which contains 2 sections and only one of them would like to go with LEED EBOM. The first section (which wants leed certification) is principally offices.

4
Founder & CEO, LEED Fellow, BREEAM Fellow
BuildingWise LLC
LEEDuser Expert
224 thumbs up
Thu Apr 16, 2015, 2:43 pm
4
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Thu Apr 16, 2015, 1:53 am

Does CI fit into BD+C?

LEED Rating System Selection
posted by  Sara Greenwood  on 

Hello, I am developing TI Guidelines for unfinished retail space in a building pursuing BD+Cv2009. Can the future tenant pursue CI?

3
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Wed Apr 15, 2015, 10:53 pm

ASHRAE standard

NC-2009 EAp2:Minimum Energy Performance
posted by  Nelina Loiselle  on 

Hello, Can someone let me know if ASHRAE 90.1 2010 is acceptable to use in relation to lighting or is 90.1 - 2007 still required to be used?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Apr 15, 2015, 6:46 pm

Baseline System Type for Hotels

NC-2009 EAp2:Minimum Energy Performance
posted by  Sandra Holmström  on 

Hi, I am wondering what Baseline System Type should be used for hotels?

3
Default Avatar
environmental consultant
Bengt Dahlgren AB
LEEDuser Basic Member
1 thumbs up
Wed Apr 15, 2015, 2:59 pm

Fundamental Commissioning Rainwater Harvesting System...

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Rick Alfandre  on 

Our current project will have a rainwater containment system that will be connected to our domestic water supply to provide water for toilet flushing and irrigation.

3
Wed Apr 15, 2015, 2:26 am

Separate MEP CxA and BECxA

NC-v4 EAc1:Enhanced commissioning
posted by  Annalise Reichert  on 

I am working on a project that is pursuing both Monitoring-based Commissioning and Building Envelope Commissioning.

3
Wed Apr 15, 2015, 2:22 am

Consistent SF throughout project

CI-2009 EAp2:Minimum Energy Performance
posted by  Stacey Olson  on 

I've recieved comments on a past project that said all square footages must be consistent throughout the project - so the SF documented in MPR 2 must be the same as EAp2 and WEp1. I'm working on a

3
Tue Apr 14, 2015, 7:20 pm