Topic | Recent |
---|---|
Glare control devices for residential projectsNC-v4 EQc7: Daylightposted by Sana Hafsa on Mar 17, 2023, 8:48 am
I have a residential project aiming for certification under LEED v4 NC BD+C (the buildings are over 8 floors). The Daylight credit includes "Provide manual or automatic (with manual override)... |
|
Glare control strategiesNC-v4 EQc7: Daylightposted by Worood Shbeikat on Jul 16, 2022, 4:55 pm
Hello, I have a question regarding the glare control strategies. the building that I'm working on came out with a result of 46.2% ASE1000/250 which is quite high (most spaces are overlit... Last reply: Charlene Mendez, Jan 19, 2023, 11:09 pm |
|
Daylight option 2 Area of Interest (AOI)NC-v4 EQc7: Daylightposted by Elena Marku on Dec 29, 2022, 10:17 pm
Hi, Could you please guide me with the following: |
|
need of two excel file to show daylight compliance?NC-v4 EQc7: Daylightposted by Alwin Jino on Aug 19, 2020, 6:59 am
As per Version 4.1, IEQ Credit-Daylight: Options 2, Illuminance calculations. it is asked to perform daylight simulation for 9 a.m and 3 p.m on a clear-sky day at the equinox. should we... Last reply: Debra a. Lombard, Aug 24, 2022, 4:39 pm |
|
Glare control devices on interior glazingNC-v4 EQc7: Daylightposted by Elise Woestyn on Feb 9, 2022, 11:24 am
Are glare control devices required only on exterior glazing? Let's say we have an office (regularly occupied) with a single window looking to a classroom and no exterior glazing. Does this... Last reply: Deborah Lucking, Feb 10, 2022, 2:03 pm |
|
Recommened software for doing the Interior and Daylighting analyses.NC-v4 EQc7: Daylightposted by Jorng-ren Chern on Apr 10, 2018, 2:05 amrequirements for defining glazing visible transmittance (TVis) than documented for prior versions of Insight Lighting in the Forum. Default Revit materials are a very good start, but when you want to define very specific glazing performance, please refer to the Forum post here: https://forums.autodesk.com/t5/lighting-solar-analysis-forum/critical-up... Log in or register to post comments Zahra Mirian... Last reply: hj hjh, Jan 4, 2022, 7:29 am |
|
DAYLIT AREA Op-2NC-v4 EQc7: Daylightposted by Ale g on Nov 24, 2020, 8:38 am
Hi to All Experts, some opertaive clarifications will be really appreciate: pursuing the credit through option 2 1. Do I have to select for the whole building the worst case form... Last reply: Ale g, May 6, 2021, 11:05 am |
|
for option 3- take light meter measurements with lights on / off?NC-v4 EQc7: Daylightposted by Beth Brant on Apr 14, 2021, 11:52 am
Does anyone know if we are required to take light meter measurements with the interior lights on or off? I am assuming they need to be off but since the lighting has occupancy and daylighting... Last reply: Ale g, May 6, 2021, 10:41 am |
|
What if daylight/views are not allowed in a reasearch laboraty space?NC-v4 EQc7: Daylightposted by J Schütz on Apr 28, 2021, 11:56 am
Dear all, we are currently working on a research laboratory, which contains normal daylighted office spaces and enclosed laboratory spaces. The occupants will switch between their desk and... Last reply: Ale g, Apr 30, 2021, 3:11 am |
|
Adjusting for Daylight Saving TimeNC-v4 EQc7: Daylightposted by Ale g on Dec 12, 2020, 1:35 pm
Hi, When asked to taking into account daylight saving time to perform... |