Topic | Recent |
---|---|
Office kitchen to be considered as regularly occupied space for Daylight AnalysisNC-v4 EQc7: Daylightposted by Rajat Kumar on Jul 19, 2024, 7:20 am
We are working on a project involving an office building with a kitchen with a total area of 50 square meters. We don |
|
Regularly occupied area of an hotel roomNC-v4 EQc7: Daylightposted by Ilse Dijkstra-Nugteren on Apr 5, 2016, 6:34 am
Should the entrance area of a hotel room (small area ( Last reply: Deborah Lucking, May 13, 2024, 11:38 am |
|
Daylight Option 2 Grid SizeNC-v4 EQc7: Daylightposted by Ziad Zeytoun on Jul 31, 2019, 10:09 am
The LEED Reference Guide does not specify a grid size for daylight... Last reply: SangHoon Hwang, Apr 7, 2024, 10:18 pm |
|
LEED Daylight Simulation Option1 with IES-VENC-v4 EQc7: Daylightposted by Mahshid Sedighimoghaddam on Jan 10, 2024, 4:57 am
Hello everyone, We are doing Daylight simulation with IES-VE software in compliance with LEED daylighting Option 1. We know that it is required two sets of simulations with and... |
|
Glare control devices for residential projectsNC-v4 EQc7: Daylightposted by Sana Hafsa on Mar 17, 2023, 8:48 am
I have a residential project aiming for certification under LEED v4 NC BD+C (the buildings are over 8 floors). The Daylight credit includes "Provide manual or automatic (with manual override)... |
|
Glare control strategiesNC-v4 EQc7: Daylightposted by Worood Shbeikat on Jul 16, 2022, 4:55 pm
Hello, I have a question regarding the glare control strategies. the building that I'm working on came out with a result of 46.2% ASE1000/250 which is quite high (most spaces are overlit... Last reply: Charlene Mendez, Jan 19, 2023, 11:09 pm |
|
Daylight option 2 Area of Interest (AOI)NC-v4 EQc7: Daylightposted by Elena Marku on Dec 29, 2022, 10:17 pm
Hi, Could you please guide me with the following: |
|
need of two excel file to show daylight compliance?NC-v4 EQc7: Daylightposted by Alwin Jino on Aug 19, 2020, 6:59 am
As per Version 4.1, IEQ Credit-Daylight: Options 2, Illuminance calculations. it is asked to perform daylight simulation for 9 a.m and 3 p.m on a clear-sky day at the equinox. should we... Last reply: Debra a. Lombard, Aug 24, 2022, 4:39 pm |
|
Glare control devices on interior glazingNC-v4 EQc7: Daylightposted by Elise Woestyn on Feb 9, 2022, 11:24 am
Are glare control devices required only on exterior glazing? Let's say we have an office (regularly occupied) with a single window looking to a classroom and no exterior glazing. Does this... Last reply: Deborah Lucking, Feb 10, 2022, 2:03 pm |
|
Recommened software for doing the Interior and Daylighting analyses.NC-v4 EQc7: Daylightposted by Jorng-ren Chern on Apr 10, 2018, 2:05 amin the Forum. Default Revit materials are a very good start, but when you want to define very specific glazing performance, please refer to the Forum post here: https://forums.autodesk.com/t5/lighting-solar-analysis-forum/critical-up... Log in or register to post comments Zahra Mirian LEEDuser Basic Member July 24, 2019- 4:53 pm Thanks for your response David, I have the latest version of Insight on my Revit 2019. I have cleaned up... Last reply: hj hjh, Jan 4, 2022, 7:29 am |