Forum quick links
Signage in a Core & Shell space?
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Erica Downs on
We have a very large residential project, registered under NCv3, with a couple of core & shell retail spaces on the ground level.
BPDO Calculator / Total materials cost
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Kevin Wilcox on
Looking for clarification on ‘Total materials cost’ number from BPDO calculator (Materials tab). Where does ‘Total materials cost’ number come from?
Purchasing RECs for Projects with District Cooling
CS-2009 EAc6:Green Powerposted by Katherine Ann Resurreccion on
Hi, we have a LEED 2009 registered Core and Shell project in the Philippines which utilizes district cooling.
Bicycle Storage for residential part in mixed used building
CS-v4 LTc6:Bicycle facilitiesposted by Malti Gupta on
I'm working on mixed used LEED CS v4 project. we have Offices, retail & residential areas.
Terraces / balconies recreational Space?
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Patrice McVeigh on
Hi, based on the LEED interpretation that recreational courts can be excluded from the Roof area calculation, would this mean that terraces which are being designed as recreational space for the bu
Operable windows in lieu of controls - what about WOCDs
CS-2009 IEQc6:Controllability of Systems—Thermal Comfortposted by Andreas Hintz on
For determing the openable wall area (which has to be a minimum of 4% of the net occupiable floor area) should WOCDs (Window Opening Control Devices) be considered?
Motorized Gravity Dampers ASHRAE 90.1 Mandatory Requirement
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jorge Torres-Coto on
Per the Mandatory Requirement of ASHRAE 90.1-2007 section 6.4.3.4.2 a gravity vent is required to be equipped with dampers that shut automatically. Though the 90.1 does not have an exception if th
Lighting Boundary Line
NC-v4 SSc6:Light pollution reductionposted by Gregory Martin on
Working on a project where the property line is adjacent to a railroad track operated by a private railway company(BNSF).
Baseline system selection
NC-v4 EAp2:Minimum energy performanceposted by Gaston Michaud on
Hello everyone, We are working with a building that has a complicated geometry, and the selection of the baseline system is not that evident.
timeframe of applicable products
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by emily reese moody on
I swear I saw this info somewhere, but cannot locate it now. What's the timeframe of product purchase in terms of applicability for this credit (and inclusion with LEED documentation/compliance in