Forum quick links
Easily Achievable Where Mandates are in Place
Pilot-Credits SSpc129:Comprehensive Compostingposted by Marsha Gentile on
This pilot credit is easily achievable where mandates and infrastructure (by municipality and/or base building in case of CI project) are in place.
Acceptability of >300 Setpoint Not Met Hours in High Equipment Load Rooms (e.g., UPS Battery Rooms) – Airport Project
NC-v4 EAp2:Minimum energy performanceposted by Anurag Ghosh on
Hello everyone,
IPpc98 feasibility for USACE projects
Pilot-Credits IPpc98:Assessment and Planning for Resilienceposted by Alison Kerr on
The credit can be documented and achieved for USACE projects, and it is in line with Army customer increased attention to resilience.
IPpc98 feasibility for USACE projects
Pilot-Credits IPpc98:Assessment and Planning for Resilienceposted by Alison Kerr on
The credit can be documented and achieved for USACE projects, and it is in line with Army customer increased attention
Clarification on ASHRAE 90.1-2010 Scope for External Equipment
NC-v4 EAc2:Optimize energy performanceposted by Anurag Ghosh on
Hi everyone,
Renewable Energy Credit Interaction with updated Mininum and Optimize Energy Performance
NC-v4 EAc2:Optimize energy performanceposted by Camilo Velez on
Hi all,
Required documentation for WEc3 Option 1 Cooling Tower Cycles of Concentration
NC-v4.1 WEc3:Optimize Process Water Useposted by Mark Benson on
For Option 1 Cooling Tower Cycles of Concentration, in addition to filling out the Potable water analysis table and uploading "a narrative describing the methodology that was used to conduct the po
Submitting Minimum Energy Performance Data for Multiple Buildings in LEED Campus Group Approach
CS-v4 EAp2:Minimum energy performanceposted by Alvaro Twose on
Hello LEED colleagues,
Prevention through Design - BOD e OPR
Pilot-Credits IPpc93:Prevention through Designposted by Adriana Hansen on
Hello,
Painting HVAC Units on roof
NC-v4 SSc5:Heat island reductionposted by Deborah Stadler on
The client is close to getting the credit and wondered if painting the units on the roof would help. I think it does from a heat island effect, but not from a LEED Credit point of view.