Forum quick links
Can we write up this plan and use it as the basis for our EBOM?
Pilot-Credits SSpc64:Site improvement planposted by Katherine Carlin on
Hi there, We are wondering if we can get a pilot credit for creating this plan by identifying everything that we are doing this year for our EBOM.
Sample download
NC-2009 WEc1:Water Efficient Landscapingposted by Yueling Chen on
I just purchase a premium membership, but i can't download the word & excel version sample in Documentation toolkit, like Sample Narrative for WEC1-Option 1, Option2 Path1 & Path 2 in WE C1
Additional Floors for Existing LEED Certified Project
CS-2009 PIf1:Minimum Program Requirementsposted by Nandana Kumar on
Hi We have a project which is G+10 floors & is LEED CS 2008 Gold certified. Now the developer is planning to expand this building by adding 4 more floors over and above the 10th floor.
shuttle buses
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Weidong Luo on
there are 8 stops/stations within 1 mile radius form our project serving 47 public bus/light rail lines, and 2 of them are municipal public transportation hubs that connect the vicinity to downtown
Coat area - regularly occupied?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Eric White on
We have an K-6 school project which is mostly views-compliant. One issue we are having in getting above 90% views requirement is the coat area at the rear of the classroom.
Autocontrol vs smart sensor-activated faucets and duration times
NC-v4 WEp2:Indoor water use reductionposted by Heather DeGrella on
Per the LEEDv4 Reference Guide "Duration-based savings from auto-control faucets w/ automatic fixture sensors or metering controls are no longer allowed in the design case.
Updates to LEEDOnline forms November-December 2014
posted by Deborah Lucking on
It is wonderful that the new leedonline includes a feature that provides an update on new activities by various team members.
LEED Core&Shell?
posted by Lise Dannesboe on
Hi! Our building is a renovation project in which the developer does a total refurbishment of building base systems and building shell. The building is mainly office building, a small part appr.
EAc2.3 - Ongoing Cx forms
EBOM-2009 EAc2.3:Existing Building Commissioning—Ongoing Commissioningposted by Alexis Voeltner on
Hi Hannah, do you have an example of what the on-going commissioning test form should look like?
Ceramic wall tile adhesives and grouts
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Nelina Loiselle on
Hello, This may seem like a stupid question, but I am working on a project that has porcelain wall tile being installed in bathrooms and I'm not sure how this is supposed to be listed under IEQc4.