LEED Pilot Credits
LEED Pilot Credit Library
Sites-Related Pilot Credits
Site improvement plan

Pilot-Credits SSpc64: Site improvement plan

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

This is a pilot credit. To use any pilot credit on your LEED project, be sure to register here. Documentation requirements and additional questions are listed below.
To preserve and improve ecological integrity while supporting high-performance building operations.
Pilot Credit Closed
This pilot credit was closed to new pilot credit registrations on 3/1/2015. It is now available in the LEED Innovation Catalog for ongoing use by project teams as an innovation point rather than a pilot credit.

Requirements

Establishment

Develop a five-year site improvement plan that includes the following:
  • documentation of existing site conditions;
  • site improvement objectives;
  • performance standards to evaluate ongoing progress; and
  • monitoring protocols.
The improvement plan must address the following topics.
  • Hydrology. Protection and improvement of water bodies on-site, rainwater management and reuse opportunities, potable water-use reduction.
  • Vegetation. Documentation of existing vegetation on-site, turf area reduction, management of native and invasive plants, protection of threatened, endangered or unique species.
  • Soils. Documentation of general soil structure, preservation of healthy soils, remediation of compacted soils, identification of previously disturbed area.
The plan must be developed with professionals trained and experienced in the above disciplines.

Performance

Show that at least 5% of the site is vegetated. Implement all no-cost and low-cost measures. Develop a new improvement plan and implement all new no-cost and low-cost measures every five years.

General Pilot Documentation Requirements

Register for the pilot credit Credits 1-14 Credits 15-27 Credits 28-42 Credits 43-56 Credits 57-67 Credits 68-82 Credits 83--96
Credit specific:
Establishment Provide the following:
  1. A copy of the Site Improvement Plan addressing the areas listed in the requirements. If an area is not specifically addressed, explain the reason(s) why.
  2. A drawing of the existing site conditions
  3. Calculations showing compliance with the 5% threshold
  4. A list of professionals consulted for the development of this plan
Performance Provide the following:
  1. A list of all no-cost and low-cost measures implemented
  2. Every 5 years: the items listed above under Establishment
Additional questions:
  1. The goal of this credit is to improve upon existing site conditions and support high-performance operations by evaluating sustainable site management options. Do you believe that these requirements achieve this intent? Why or why not?
  2. Did you encounter difficulties in gathering the information for the improvement plan? If so, in what ways?
Changes::
  • Changes as a result of 5th Public Comment (01/15/2013): Updated with SSc6 EBOM - Wording changes- rewording for clarification
See all forum discussions about this credit »

Frequently asked questions

No results found
See all forum discussions about this credit »

What does it cost?

Cost estimates for this credit

On each BD+C v4 credit, LEEDuser offers the wisdom of a team of architects, engineers, cost estimators, and LEED experts with hundreds of LEED projects between then. They analyzed the sustainable design strategies associated with each LEED credit, but also to assign actual costs to those strategies.

Our tab contains overall cost guidance, notes on what “soft costs” to expect, and a strategy-by-strategy breakdown of what to consider and what it might cost, in percentage premiums, actual costs, or both.

This information is also available in a full PDF download in The Cost of LEED v4 report.

Learn more about The Cost of LEED v4 »

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Checklists

Step by step to LEED certification

LEEDuser’s checklists walk you through the key action steps you need to earn a credit, including how to avoid common pitfalls and save money.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Addenda

This credit has no LEEDuser summary

See all forum discussions about this credit »
Guest expert

Batya Metalitz

USGBC
Technical Director, LEED

LEEDuser overview

Frank advice from LEED experts

LEED is changing all the time, and every project is unique. Even seasoned professionals can miss a critical detail and lose a credit or even a prerequisite at the last minute. Our expert advice guides our LEEDuser Premium members and saves you valuable time.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now

Credit language

USGBC logo

© Copyright U.S. Green Building Council, Inc. All rights reserved.

Intent

This is a pilot credit. To use any pilot credit on your LEED project, be sure to register here. Documentation requirements and additional questions are listed below.
To preserve and improve ecological integrity while supporting high-performance building operations.
Pilot Credit Closed
This pilot credit was closed to new pilot credit registrations on 3/1/2015. It is now available in the LEED Innovation Catalog for ongoing use by project teams as an innovation point rather than a pilot credit.

Requirements

Establishment

Develop a five-year site improvement plan that includes the following:
  • documentation of existing site conditions;
  • site improvement objectives;
  • performance standards to evaluate ongoing progress; and
  • monitoring protocols.
The improvement plan must address the following topics.
  • Hydrology. Protection and improvement of water bodies on-site, rainwater management and reuse opportunities, potable water-use reduction.
  • Vegetation. Documentation of existing vegetation on-site, turf area reduction, management of native and invasive plants, protection of threatened, endangered or unique species.
  • Soils. Documentation of general soil structure, preservation of healthy soils, remediation of compacted soils, identification of previously disturbed area.
The plan must be developed with professionals trained and experienced in the above disciplines.

Performance

Show that at least 5% of the site is vegetated. Implement all no-cost and low-cost measures. Develop a new improvement plan and implement all new no-cost and low-cost measures every five years.

General Pilot Documentation Requirements

Register for the pilot credit Credits 1-14 Credits 15-27 Credits 28-42 Credits 43-56 Credits 57-67 Credits 68-82 Credits 83--96
Credit specific:
Establishment Provide the following:
  1. A copy of the Site Improvement Plan addressing the areas listed in the requirements. If an area is not specifically addressed, explain the reason(s) why.
  2. A drawing of the existing site conditions
  3. Calculations showing compliance with the 5% threshold
  4. A list of professionals consulted for the development of this plan
Performance Provide the following:
  1. A list of all no-cost and low-cost measures implemented
  2. Every 5 years: the items listed above under Establishment
Additional questions:
  1. The goal of this credit is to improve upon existing site conditions and support high-performance operations by evaluating sustainable site management options. Do you believe that these requirements achieve this intent? Why or why not?
  2. Did you encounter difficulties in gathering the information for the improvement plan? If so, in what ways?
Changes::
  • Changes as a result of 5th Public Comment (01/15/2013): Updated with SSc6 EBOM - Wording changes- rewording for clarification
See all forum discussions about this credit »

Documentation toolkit

The motherlode of cheat sheets

LEEDuser’s Documentation Toolkit is loaded with calculators to help assess credit compliance, tracking spreadsheets for materials, sample templates to help guide your narratives and LEED Online submissions, and examples of actual submissions from certified LEED projects for you to check your work against. To get your plaque, start with the right toolkit.

For full access, sign up now for LEEDuser Premium

Already a premium member? Log in now


Guest expert

Batya Metalitz

USGBC
Technical Director, LEED