Sidewalk with landscaped areaND-v2009 NPDp1: Walkable Streetsposted by Noriko Nagazumi on Jun 14, 2017, 9:52 pm
Hi, In our project, continuous sidewalks of 2.5m width are provided for all street within the project boundary, but a portion of one of the sidewalks is filled with shrabs and trees and... |
|
Frontage Width and Block LengthND-v2009 NPDp1: Walkable Streetsposted by lara Tahhan on Nov 3, 2015, 8:32 am
Hello, I would like to inquire about the frontage widths. If the buildings are not parallel to the road and are at an angle , would the frontage width be the length of the actual building... |
|
Parking GarageND-v2009 NPDp1: Walkable Streetsposted by Susann Geithner on Jun 18, 2015, 12:18 pm
We have a parking garage attached to an office building. The office building is on a public street, so is the garage. So the building is between two streets. Does the garage count into the new... |
|
Breezeway Principal Functional Entry?ND-v2009 NPDp1: Walkable Streetsposted by Tommy Linstroth on Mar 4, 2015, 9:30 am
Just hoping for a clarification/second opinion. Our project features 2-3 story walkup apartments that are access by central breezeways. The breezeways front the street, are connected to the... |
|
Ratio 1:3ND-v2009 NPDp1: Walkable Streetsposted by Diana Nezamutinova on Aug 6, 2014, 2:22 pm
Greetings, Eliot! Would you please be so kind to help with 4 questions below? Thank you. Phrase “Within and bordering the project” – does it mean that buildings facing small pedestrian... |
|
Continuous sidewalks for industrial use streetND-v2009 NPDp1: Walkable Streetsposted by Noriko Nagazumi on Apr 3, 2014, 5:23 am
Hi there! The reference guide says: "Continuous sidewalks or equivalent all-weather provisions for walking are provided along both sides of 90% of streets or frontage within the project,... |
|
Building FrontageND-v2009 NPDp1: Walkable Streetsposted by Tommy Linstroth on Jan 17, 2014, 10:46 am
Our project is a 100% gut rehab of existing attached townhomes. I just want to clarify, since the credit language states new building frontage, we are exempt from having to demonstrate that our... |
|
Internal streetsND-v2009 NPDp1: Walkable Streetsposted by Sarah Michelman on Oct 23, 2013, 4:04 pm
If a proposed development project site is located on two city blocks on either side of a major existing through street and this is the only street within the project, can the development be... |
|
Front lawn sidewalk widthND-v2009 NPDp1: Walkable Streetsposted by Colin Day on Sep 9, 2013, 5:11 pm
Hi Eliot, Our project has entry walks leading from public sidewalks to front doors that are slated to be 3 feet wide. Are these sidewalk exempt from the 4' minimum because they are not... |
|
Building height to street width ratio calculationND-v2009 NPDp1: Walkable Streetsposted by Tyler Baker on Jun 6, 2013, 10:49 am