Forum quick links
Interior Project Water Performance
EBOM-v4.1 WEc1:Water Performanceposted by yingling guan on
For interior project, if there is only one pantry faucet within the project scope. And occupants of this project will use other indoor water fixtures or fittings installed out of the thi
Shopping mall is LEED BD+C CS or Retail
posted by Michael Wahjudi on
HI all, we have shopping mall development. Is the shopping mall fall under LEED BD+C Core and Shell OR retail under v4.1?
we're hiring - would appreciate your help making a connection!
posted by Julia Siple on
Hi! Quinn Evans is looking for a great candidate for a new position that focuses on design performance analysis.
Submitting for additional Design Credits at Construction Credit Review Stage
posted by Philippa Cameron on
Hi. We are preparing to register a project and submit documentation for the design credits following a split review approach.
How to scrutiny the local testing agency's report for LEED Low emitting materials?
Retail-CI-v4.1 EQc2:Low Emitting Materialsposted by Sagar Siripuram on
Hello, I've been having this doubt for many days, Just wanted clarity on this query.
Nonroof measures for roof terrace
NC-v4.1 SSc5:Heat Island Reductionposted by Reshadee Weerasooriya on
Hi all,
Compliant EPR Programs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Amanda Tullos on
Has anyone had luck getting credit for a take back service program like Steelcase's (https://www.steelcase.com/services/#recycle
building on campus with no smoking policy
CI-v4 EQp2:Environmental tobacco smoke controlposted by Megan Valentine on
We are renovating a building on a campus. The campus has a no smoking policy with signage stating the policy at all entrances to the campus.
Campus approach: can we install water meter for the entire landscape, sanitaryware as a whole
NC-v4 WEc4:Water meteringposted by Michael on
My project is a campus project, consisting of 4 individual buildings. To fulfill this credit, can I install 1 meter to monitor sanitaryware for 4 buildings together as a whole?
PV Solar Panels outside LEED Boundary
NC-2009 EAc2:On-Site Renewable Energyposted by Ammar Yahia on
A New Construction Project in which the PV panels to be installed on a "330,000 SQM roof of an airport terminal building project" to offset 22% of annual energy cost.