A New Construction Project in which the PV panels to be installed on a "330,000 SQM roof of an airport terminal building project" to offset 22% of annual energy cost.
Is it possible to install the PV system out of the LEED boundary, and still meet the credit on-site renewable energy?
And if yes. Is there a maximum distance allowed or any other conditions required to meet the credit?