Topic | Recent |
---|---|
IEQp1 ASHRAE Section 4 through 7CI-2009 IEQp1: Minimum indoor air quality performanceposted by Diana Hill on Aug 23, 2012, 10:29 pm
We are working on a office interior design project. LEED CI IEQp1 says the requirement is "Meet the minimum requirements of Section 4 through 7 of ASHRAE Standard 62.1-2007, Ventilation for... Last reply: Roger Chang, Aug 31, 2012, 1:38 pm |
|
Ds NarrativeCI-2009 IEQp1: Minimum indoor air quality performanceposted by Bob Baker on May 31, 2012, 8:30 pm
I am new to the ASHRAE MZ62 calculator and I am not clear on how to write the narrative regarding : |
|
System serving new and exisitng spacesCI-2009 IEQp1: Minimum indoor air quality performanceposted by Michelle Ruda on Jul 19, 2011, 9:43 am
In the reference book, under IEQc1 point 4. Implementation, it states that "This prerequisite is not limited to the project scope of work." Could someone please clarify exactly what this is... Last reply: Neil Rosen, May 23, 2012, 2:24 pm |
|
Exemption for IEQp1 for LEED 2009 CI RetailCI-2009 IEQp1: Minimum indoor air quality performanceposted by Smart Green on Apr 24, 2012, 1:42 pm
I am working on LEED CI 2009 Retail Shop. This shop is using existing wall, roof and floors and existing AC units in a shopping mall. In this shop there is window provision and surrounded by... Last reply: Roger Chang, Apr 26, 2012, 2:43 pm |
|
RE: IEQ.p1- 62 MZ-ASHRAE CalculatorCI-2009 IEQp1: Minimum indoor air quality performanceposted by Bobby Ghataura on Apr 26, 2012, 2:34 pm
I have a 3 story non-residential building, and... Last reply: Roger Chang, Apr 26, 2012, 2:38 pm |
|
IEQp1 Compliance?CI-2009 IEQp1: Minimum indoor air quality performanceposted by George Bender on Apr 19, 2012, 11:23 am
Office floor of a high rise building trying to obtain LEED sliver. Floor is served by... |
|
No Engineer on ProjectCI-2009 IEQp1: Minimum indoor air quality performanceposted by Paul Meyer, PE, CEM, CBCP, GBE LEED AP on Dec 13, 2011, 3:24 pm
All HVAC mechanical systems were existing. Only the ductwork was installed. There is Engineer for this project is there a way to comply without the signature? Last reply: Rob Hink, Mar 22, 2012, 10:49 am |
|
LEED CS v2009 certified buildingCI-2009 IEQp1: Minimum indoor air quality performanceposted by Aaron Yorke on Dec 23, 2011, 8:45 am
Hi all, We have a small LEED:CI project in a CS certified shopping mall. We don't have any direct outdoor air intakes, we take the air from the main atrium and give it to our space. The... Last reply: Roger Chang, Mar 8, 2012, 6:23 pm |
|
VRP Compliance CalculatorCI-2009 IEQp1: Minimum indoor air quality performanceposted by Juliana Malho on Nov 24, 2011, 7:59 am
We have a CI project with multiple zone units and... Last reply: Roger Chang, Dec 19, 2011, 9:48 am |
|
Min Airflow in Intermittent Occupancy SpacesCI-2009 IEQp1: Minimum indoor air quality performanceposted by Rick Servoss on Sep 14, 2011, 2:13 pm
We received a comment back on a CI project stating: "Demonstrate the system serving the special occupancy space is capable of modulating system and zone minimum supply volume below 0.30... Last reply: Roger Chang, Nov 23, 2011, 10:55 am |