Forum quick links
What rating system for mixed use development
posted by shashank jain on
Hi we are putting a proposal for a new project that is 70% residential (about 10 stories high), 20% retail and 10% hotel all the residential buildings are separate identity buildings while they
CS vs NC for Mixed Use + Residential
posted by Saju Varghese on
We currently have a project with around 70 % of residential area (around 8 floors) and 30% of retail.
Banking branch: LEED for Retail NC or CI?
posted by Silvia Ruiz on
Hi, This is the issue: the banking branch in question will be located in a new shopping center.
LEED NC or CI?
posted by Catherine Maxemchuk on
We are working on a project, renovation of an existing 3 story building in an urban area.
Minimum occupancy requirements for projects pursuing LEED NC
posted by Guillermo Hernandez Espinoza on
Hi. The project is registered under LEED BD+C: New Construction v2009. Is there any Addenda that perhaps changed what is required for a project pursuing LEED NCv2009 from 50% to 0%? (For such a
LEED-CI Gold without LEED-CS ?
posted by Kevin Short on
We are renovating a 60,000 sq ft office building in SF.
LEED CS, do all techn. systems need to meet the requirements?
posted by Torsten Biernat on
An office building is undergoing a renovation of all tenant areas, including some of the overall techn. systems, see list below. The project team wants to use Major Renovation / CS.
LEED Rating System - which one?
posted by Katherine Sheesley on
Academic building of 75,000 SF on 3 floors with multipurpose class labs, faculty office and classrooms on a community college campus. Should the LEED v4 NC or LEED v4 Schools rating system be used
CS vs NC
posted by Karl Heitman on
The project is a new, ground-up, manufacturing/warehouse/office building, and due to heavy process loads, it does not seem to meet LEED NC EA p2, and the owner will not purchase any new equipment t
LEED CS VS LEED NC
posted by Javier Garcia Jones on
Hi, I'm working in major renovation on an office project that is going to be lease out once it's finnished. Project scope includes initial tenant fit out (HVAC, lignting, ceilings,etc). Which rati