Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

High Priority Site - Priority Destination for projects outside U.S.

CS-v4 LTc3:High priority site
posted by  Sajna Cherur Nathankoden  on 

Hi, 
What are the examples for Priority Destination for projects outside U.S.?

1
Fri Apr 19, 2024, 1:45 pm

Does a "Hot Zone" in a Fire Station need individual door closers?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Adrienne Franz  on 

Our Project is a Fire Station that has an area defined as a "hot zone" which includes the apparatus bay, decontamination room, a restroom, tool storage, lawn storage, turnout gear lockers, a janito

0

REACH and Global Green Tag certification count for the Optimization

NC-v4.1 MRc4:Material Ingredients
posted by  Summer Gorder  on 

Can REACH and Global Green Tag certifications count for the Optimization even if they aren't international projects?

 

1
Thu Apr 18, 2024, 12:29 pm

Process Water and Arc

EBOM-v4.1 WEc1:Water Performance
posted by  Jenni Betancourt  on 

I've been trying to communicate with Arc with no luch. We have Arc Essentials which supossedly could help us determining our potential score.

1
Thu Apr 18, 2024, 6:31 am

Would a fire sprinkler system count as "other process water"

NC-v4 WEc4:Water metering
posted by  Cindy Quinn  on 

Has anyone had success with a fire sprinkler system being one of the subsystems?  Would it count as "other process water"?

TIA!

1
Wed Apr 17, 2024, 6:46 am

Pilot Closed - attending LEED v4.1 Optimize Process Water Use

Pilot-Credits WEpc94:No Cooling Tower
posted by  Adriana Hansen  on 

This pilot credit has been used in many office projects with VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1 in

0

Pilot Closed - attending LEED v4.1 Optimize Process Water Use

Pilot-Credits WEpc94:No Cooling Tower
posted by  Adriana Hansen  on 

This pilot credit allows to many office buildings that have a VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1 includ

0

Number of eligible Innovation credits from Pilot Credits

NC-v4 INc1:Innovation
posted by  Jason Garvens  on 

Can anyone confirm the number of points that can be earned solely through achieving Pilot credits? 

16
Tue Apr 16, 2024, 12:59 am

EAc2 Optimize Energy Performance: Baseline Building Heating Source

NC-v4 EAc2:Optimize energy performance
posted by  Ricardo Sá  on 
Hello. I have a question regarding LEED v4 NC, EAc2 Optimize Energy Performance: We’re currently involved in a project that is considering the use of biomass as heating source (space heating and dom
2
Tue Apr 16, 2024, 12:55 am