Forum quick links
Chilled Water vs DX System 5 is currently flawed.
NC-v4 EAp2:Minimum energy performanceposted by Alejandro Vera on
At issue, our proposed system (chilled water) is paired against a System 5 (non-residental < 5 floors & 25,000 < SQFT < 150,000) but we are having a problem with the energy modeling wh
Tenants HVAC System Type
CS-2009 EAp2:Minimum energy performanceposted by Amgad Khattab on
We are modeling a Core & Shell office building where the HVAC system is in the tenant scope. we are only delivering chilled water and outdoor air to the tenant areas.
Delete a Campus.
NC-v4 MPR1:Must be in a permanent location on existing landposted by Guillermo Hernandez Espinoza on
I create an example of a campus project registration with the sole objetive of guidance for a client so they can register their project themselves.
Core and Shell Office Building
EBOM-v4 EAp2:Minimum energy performanceposted by Gustav Alfaro on
Hi to all,
Thinner use
CS-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by ilse angel on
credit for renewables on site?
NC-2009 EAc6:Green powerposted by Melissa Merryweather on
Some of the credit language mentions renewables generated on site. We are generating 29.9% of our energy annually from renewables.
Option 1
NC-v4 LTc4:Surrounding density and diverse usesposted by Edgar Arevalo on
When it comes to satisfying the requirements for option 1, does the "total buildable land" represent land (or street blocks) that contain only homes, homes and residential buildings, or only reside
Individual Components
NC-v4 INc1:Innovationposted by Bobby White on
Hi, Was wondering if someone has insight to this:
IEQc8.2 Views - Glass Tint Clarification
NC-2009 IEQc8.2:Daylight and views - viewsposted by Summer on
Hello everyone,
EApc95-Mid Rise LEEDv4 Homes
Pilot-Credits EApc95:Alternative Energy Performance Metricposted by Brightworks Sustainability on
Our project is a 275,000 sf high-rise mixed use residential building in Portland, Oregon.