Can we still get points with City's proposed Bicycle Network?

NC-v4.1 LTc6:Bicycle Facilities
posted by  Arega Mehrabian  on 

We are currently designing Aquatic center near Pioneer High School. there are proposed/Adopted Bike Network passing our site. is that goint to be acceptable?

1
Thu Jun 3, 2021, 7:26 pm

Pilot-Credits EApc95 - Alternative Energy Performance Metric - LEED Transit New York City

Pilot-Credits EApc95:Alternative Energy Performance Metric
posted by  Pamela Mendez  on 

Our Project team was able to use this pilot credit to achieve (1) additional point for our Transit Hall Project located in NYC.

0

Do jail cells need to have thermal controls?

NC-v4 EQc5:Thermal comfort
posted by     on 

I am currently working on a project that has short term jail/holding cells that are classified as inidividual occupant spaces.

2
Principal | Practice Lead
BranchPattern
LEEDuser Premium Member
6 thumbs up
Thu Jan 14, 2021, 2:47 pm

ASHRAE 90.1-2010 VS. MLO lighting zone

NC-v4 EAp2:Minimum energy performance
posted by  Nuttanee Vongveeranonchai  on 

I am working on a project locating on a commercial corridor of a capital city.

6
Default Avatar
Green building manager
Confidential
LEEDuser Basic Member
13 thumbs up
Thu Jan 14, 2021, 2:34 am
3
Wed Jan 13, 2021, 10:16 pm

What is GBCI Docverification_ID?

CS-v4.1 MRc2:Environmental Product Declarations
posted by  Ward Miller  on 

The most recent version of the v4.1 materials calculator on the EPD and Sourcing of Raw Materials tabs has a column that did not exist in the v4 version called, "GBCI Docverification_ID".

1
Wed Jan 13, 2021, 6:26 pm
1
Fri Jan 15, 2021, 7:19 am

Mixing waste from full building with CI

CI-v4 MRc6:Construction and demolition waste management
posted by  Jennifer Kruse  on 

We have a 45 story Core and Shell project in a downtown area with minimal space for dumpsters.  This base project is still under construction and not going for LEED.  However, within this

3
Sustainable Consultant
INSPEC Sustainability Group LLC
LEEDuser Premium Member
43 thumbs up
Wed Jan 13, 2021, 1:33 pm

Minimum number of charging stations

NC-v4 LTc8:Green vehicles
posted by  Summer Minchew  on 

I note that LEED v4 credit language states: Install electrical vehicle supply equipment (EVSE) in 2% of all parking spaces used by the project.

1
Tue Jan 19, 2021, 8:34 pm