Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Nonpotable water source

NC-v4 WEc2:Indoor water use reduction
posted by  Ricardo Sá  on 

Hi,

according to Reference Guide, Nonpotable water is water that does not meet drinking water standards.

4
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Fri Jul 23, 2021, 3:07 pm

ASHRAE 90.1-2013 for LEED v2009

CS-2009 EAc1:Optimize Energy Performance
posted by  Elena Arca  on 

Hi, 

I inherited a LEED project during the GBCI review period and I'm trying to make sense of our points for this credit. 

1
Tue Aug 3, 2021, 4:01 pm

Health Product Declarations

CI-v4 MRc5:Building product disclosure and optimization - material ingredients
posted by  John Masters  on 

We are getting HPDs that have been created by the manufacturer using "HPDC Online Builder / Health Product Declaration v2.2".

4
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Fri Jul 23, 2021, 12:05 pm

Self Certification for Emissions

NC-v4 EQc2:Low emitting materials
posted by  Michelle Rosenberger  on 

I have a letter from a major manufacturer who is indicating that they have performed an emissions test on one of a line of similar chemical products.

4
Thu Jul 22, 2021, 9:22 pm

AgBB and French A+ equivalent outside of the US

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Alexandre DENEUVILLE  on 

Hi everyone,

I have seen in a recent Addenda that the equivalency with the AgBB standard and French A+ label for formaldehyde has been removed from the available options.

2
Thu Jul 22, 2021, 9:29 am

Definition of Core Learning Space

Schools-NC-v4 EQp3:Minimum acoustic performance
posted by  Mohammad H Abbasi  on 

Hi All, 

Does anyone know if we need to include metal and wood shops as core learning spaces for the prerequisite?

 

7
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jul 21, 2021, 8:13 pm

Timeline for priority designation

NC-v4 LTc3:High priority site
posted by  David Hryvniak  on 

I'm working on a project which is on a site that was in a Qualified Census Tract in 2019.  However, the site is no longer within a QCT.

1
Wed Jul 21, 2021, 7:43 pm

View Type 3 with Permanent Obstruction Near Ceiling

NC-v4 EQc8:Quality views
posted by  Laura Heagler  on 

We have some spaces with vision glazing 12' and 16' head height. The spaces have exposed spiral ductwork.

3
GLMV Architecture, Inc.
LEEDuser Basic Member
1 thumbs up
Wed Jul 21, 2021, 4:01 pm

Existing Building Demolition

CS-v4.1 LTc3:High Priority Site and Equitable Development
posted by  Narguess Kh  on 

I am working on a project which will be built on existing site. Results of site assessment shows presence of asbestos and soil pollutions.

1
Wed Jul 21, 2021, 7:38 pm