Forum discussion

CS-v4 EAp2:Minimum energy performance

Vestibule required in CS industrial building?

Wondering if a CS industrial project (cold, dark shell) with unknown tenant must include a vestibule in the CS design, or if it can be assumed this will be provided as part of the tenant fit-up along with the other tenant fit-up related ASHRAE 90.1 mandatory requirements?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 09/22/2021 - 12:52

Depends on the design. If there is clearly a space intended to be the "office" with a clear entrance then a vestibule makes sense and since it is a part of the envelop being constructed as a part of the shell it would make sense to include it. Some of the other "entrances" to a large building may not be clearly "entrances" without an interior layout so you could probably lump them in with the fitout work.

Add new comment