Forum quick links
Option 2 Natural land cover conditions
NC-v4.1 SSc4:Rainwater Managementposted by Allen Cornett on
With the "retain on site" verbiage is there no longer an option to retain off-site? I have a project in a development that previous buildings have met the LEED 2009 stormwater&
Cultural smudging and ETS prereq
NC-v4 EQp2:Environmental tobacco smoke controlposted by Jason Burtwistle on
Hi all,
Concrete Recycled Content
NC-2009 MRc4:Recycled Contentposted by MT A on
We have the final content $ value of cementitious materials and the m3 of concrete produced as supplied by the contractor.
Is there a benefit/penalty with regard to points earned by using this method compared to a 2010 PRM comparison?
Pilot-Credits EApc111:Alternative Performance Rating Methodposted by Eric Dixon on
Has anyone found that they earned more or less points by using the 2016 PRM comparison rather than a 2010 PRM comparison?
Metering scope - tenant areas
CS-v4 EAp3:Building-level energy meteringposted by Ricardo Sá on
Dear All,
Lawn Equipment Inventory
EBOM-v4.1 SSc4:Site Managementposted by Green Projects on
Does this credit require to submit an inventory of all equiptment used?
November Surprise?
NC-v4.1 MRc5:Construction and Demolition Waste Managementposted by Jonathan Weiss on
I am hoping I read this wrong, but the current version of the credit on USGBC.org and the Addendum posting (as of early November) seems to have changed this credit significantly - Option 1 is 1 poi
Revised Points Thresholds APC
CS-2009 EAc1:Optimize Energy Performanceposted by Anna Korinkova on
We would like to clarify the possible Alternative Compliance Paths (ACP) options for the EAc1 (our project is C&S).
Is utilizing aerobic processor equipment an acceptable strategy for this credit?
Pilot-Credits SSpc129:Comprehensive Compostingposted by Annalise Dum on
Our project is considering utilizing kitchen equipment that uses aerobic processing to break down food waste into liquid that is then discharged via the plumbing onsite.