Hi there,

The project I am working on is a commercial office space located in Sunnyvale, CA. Being located in the Bay Area, BART and VTA service more than exceed the maximum number of weekday trips needed to achieve full points for the project (595 trips total per week, one way). However, the lower number of weekend trips provided by these services preclude the project from earning more than three points. As noted, the location is a business site (non-residential) and the project is not anticipated to be occupied on weekends. Is there an exception to the number of weekend trips provided in the case of a project typology that is only occupied Monday- Friday? Thank you, I look forward to your response!