Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Pilot-Credits WEpc94

Pilot-Credits WEpc94:No Cooling Tower
posted by  Nermin Hegazy  on 

 

I have a question regarding one of the conditions to be met to achieve this credit:

1
Wed Nov 30, 2022, 2:50 pm

Buildable land

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Filippo Weber  on 

According to LTc4 – Surrounding density and diverse uses, I would like to ask for a clarification regarding the definition of “Buildable land”.

3
Consultant, Built Ecology
WSP USA
LEEDuser Expert
15 thumbs up
Wed Sep 21, 2022, 8:19 am

Commingled Waste approach in storage locations for recyclable materials

EBOM-v4.1 MRp3:Waste Performance
posted by  Maysoon Al-Khuraissat  on 

I'm working on a huge existing Mall, Is the commingled waste approach accepted in LEED V4.1 for the Waste Performance prerequisite?

0

Considering Percent of Occupants for Kitchen Faucet in Hotel/Restaurant

NC-v4 WEc2:Indoor water use reduction
posted by  Priscilla Joseph  on 

I wanted to know if the percent of occupants can be reduced to reflect that only employees use the Kitchen Faucet and not visitors.

1
Fri Jan 13, 2023, 5:15 pm

Certification system for the Baseline project

CS-v4 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings,

The energy source of the project we are modeling is electricity only.

1
Tue Sep 20, 2022, 2:18 pm

Hot Gas Reheat

NC-v4 EAp2:Minimum energy performance
posted by  Nicolas Martinez Ochoa  on 

Hello everyone,

We are working on a project with dehumidification, which has a hot gas reheat to decrease the heating load after the cooling stage. 

1
Mon Sep 19, 2022, 11:16 pm

Artificial turf in Steep-sloped roof

NC-v4.1 SSc5:Heat Island Reduction
posted by  weam baljoon  on 

Can anyone clarify for NC-v4.1 SSc5 Option 1 Roof and Non-Roof - if Steep-sloped roof is covered with Artificial turf (decretive finish) and the product is within the minimum solar reflectance inde

1
Wed Oct 4, 2023, 12:17 am

Pilot Credit

Pilot-Credits IPpc101:Integrative Process
posted by  AMIR ZULKHAIRI AHMAD BANGI  on 

As per the requirements of the pilot credit, we are noting our participation in this forum.

 

 

0

LEED O+M v4 Pilot Credit Participation

Pilot-Credits IPpc101:Integrative Process
posted by  AMIR ZULKHAIRI AHMAD BANGI  on 

As per the requirements of the pilot credit, we are noting our participation in this forum.

1
Mon Sep 19, 2022, 12:58 pm