Forum quick links
Energy Simulation Baseline
CS-2009 EAc1:Optimize Energy Performanceposted by Yong Lee Low on
Hi, I am working on a office building of about 15,000sqm using AHU with underfloor system.
Baseline Chiller plant - System7
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, Could you please provide some advice to the following case (the building belongs to System 7): 1.
Core & Shell tenant retail space in mixed-use building
NC-2009 IEQp1:Minimum IAQ Performanceposted by Erica Downs on
Our project is a high-rise apartment building with C&S retail on the ground floor.
DES with CHP, electric and absorption chillers and boilers
NC-2009 EAc1:Optimize Energy Performanceposted by Ricardo Sá on
A building pursuing LEED 2009 NC certification will be located in a campus with a District Energy System (DES) that incorporates a CHP, absorption chillers, electric chillers and boilers.
Waste Heat from Landfill Gas Plant
NC-v4 EAp2:Minimum energy performanceposted by Aaron Luthien on
Hello all, We have an office project which utilizes waste heat from the neighbor landfill gas plant. The plant and office is owned by the same company.
Mixed Use Residential with C&S retail on ground floor
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Erica Downs on
Does anyone have insight on how to treat core & shell space, intended for retail, on the ground floor of a mixed-use residential building?
Section Table 1.4.2B- Fenestration
Schools-2009 EAp2:Minimum Energy Performanceposted by soham babu on
when the frame effects are captured within the energy modeling software option the output results for vertical glazing assembly U value will vary based on window size.
Glass in Jalousie-style
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
Hi, Is there specially I have to concern when I define the fenestration's properties for jalousie-style glass in energy modeling? Thanks in advance
Cold Shell compliance path
CS-2009 IEQp1:Minimum IAQ Performanceposted by Brightworks Sustainability on
Hi all, I'm working on a cold dark shell project where the owner is NOT building out any HVAC systems (only plumbing); the tenant will install everything.
Operable windows
NC-v4 EQc5:Thermal comfortposted by Charalampos Giannikopoulos on
For an open-plan office space with individual working spaces the project team has used operable windows in order to provide thermal comfort control.