Forum quick links
Doubts in Green power & REC
NC-2009 EAc2:On-Site Renewable Energyposted by SAMY Chamy on
Dear Concern:- Our project have windmill, additionally wind mill capacity is 10 times greater than project connoted load The project use government electricity with net metering every month the
EA Credit 2
NC-2009 EAc2:On-Site Renewable Energyposted by Cristina Parenti on
Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..
Water Use Reduction
Schools-2009 WEc3:Water Use Reductionposted by Karly Michalowski on
I have a Daycare center that's pursuing LEED-NC v2009. There are a couple of "changing room stations" that have sinks. Would these be classified as kitchen sinks or lavatory sinks? thanks!
Roof for School
Schools-NC-v4 EQc2:Low emitting materialsposted by Josh Inge on
If you are trying to achieve the Schools–NC-v4 EQc2: Low emitting materials does the type of roof you use matter ?
Joint Compound
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Michele Helou on
Joint Compound? Is it a sealant for IEQc4.1 or part of the wall system for IEQc4.6?
VRF System Computation
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Katherine Mariano on
Hi All, I just want to ask if the pre-charge or additional charge of the VRF system is included on the computation for Rc (Refrigerant Charge). Thanks!
EPDM tile and Wood Porch
Schools-NC-v4 EQc2:Low emitting materialsposted by Emmanuel Pauwels on
We are looking for compliant materials for a School project. Regarding exterior applied products, it seems, that just "applied on site" must be compliant (Adhesives, sealants, coatings, roofing, a
Treatment of Outdoor Air for Incomplete Spaces
NC-2009 EAp2:Minimum Energy Performanceposted by Joseph Chappell on
I recently received LEED review comments regarding the treatment of incomplete space in an energy model for a proposed new construction building.
Outdoor air delivery monitoring system for evaporative cooler
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Gopinath Vasu on
For projects served by evaporative cooler which is supplying 100% fresh air to conditioned spaces, is it still require to have an outdoor air delivery monitoring system. Even though at minimum flo
Atrium with reception desk
CS-v4 EQc4:Daylightposted by Martin K on
Hi, can someone help me please with these questions? 1) we have an atrium space with a reception desk in the middle.