Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Doubts in Green power & REC

NC-2009 EAc2:On-Site Renewable Energy
posted by  SAMY Chamy  on 

Dear Concern:- Our project have windmill, additionally wind mill capacity is 10 times greater than project connoted load The project use government electricity with net metering every month the

1
Fri May 26, 2017, 3:24 pm

EA Credit 2

NC-2009 EAc2:On-Site Renewable Energy
posted by  Cristina Parenti  on 

Hello, we are working on a project that intended to install solar panels on the roof but there isn't much room left for them..

1
Fri May 26, 2017, 2:53 pm

Water Use Reduction

Schools-2009 WEc3:Water Use Reduction
posted by  Karly Michalowski  on 

I have a Daycare center that's pursuing LEED-NC v2009. There are a couple of "changing room stations" that have sinks. Would these be classified as kitchen sinks or lavatory sinks? thanks!

1
Sun Aug 27, 2017, 12:14 am

Roof for School

Schools-NC-v4 EQc2:Low emitting materials
posted by  Josh Inge  on 

If you are trying to achieve the Schools–NC-v4 EQc2: Low emitting materials does the type of roof you use matter ?

0

Joint Compound

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Michele Helou  on 

Joint Compound? Is it a sealant for IEQc4.1 or part of the wall system for IEQc4.6?

0

VRF System Computation

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Katherine Mariano  on 

Hi All, I just want to ask if the pre-charge or additional charge of the VRF system is included on the computation for Rc (Refrigerant Charge). Thanks!

1
Tue Jun 6, 2017, 3:25 pm

EPDM tile and Wood Porch

Schools-NC-v4 EQc2:Low emitting materials
posted by  Emmanuel Pauwels  on 

We are looking for compliant materials for a School project. Regarding exterior applied products, it seems, that just "applied on site" must be compliant (Adhesives, sealants, coatings, roofing, a

1
Wed Jun 21, 2017, 2:53 pm

Treatment of Outdoor Air for Incomplete Spaces

NC-2009 EAp2:Minimum Energy Performance
posted by  Joseph Chappell  on 

I recently received LEED review comments regarding the treatment of incomplete space in an energy model for a proposed new construction building.

1
Tue May 30, 2017, 8:24 pm

Outdoor air delivery monitoring system for evaporative cooler

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Gopinath Vasu  on 

For projects served by evaporative cooler which is supplying 100% fresh air to conditioned spaces, is it still require to have an outdoor air delivery monitoring system. Even though at minimum flo

1
Wed May 31, 2017, 1:44 pm

Atrium with reception desk

CS-v4 EQc4:Daylight
posted by  Martin K  on 

Hi, can someone help me please with these questions? 1) we have an atrium space with a reception desk in the middle.

0