Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Liquid hand soaps/body wash

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Jutta Berns  on 

We have project that is using a liquid body wash that is technically a liquid hand soap too (purchased as both but in different packaging).

1
Wed Apr 22, 2015, 3:15 pm

Tenant agreement to exclude PFP boxes

CS-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

In our project location, it is clear that no tenants will go for a heating system. The base building is also designed for cooling only.

1
Tue Feb 17, 2015, 5:13 pm

Mechanical Boundary Differs from Overall Project Boundary

NC-2009 PIf2:Project Summary Details
posted by  John Havenstrite  on 

I am working on a project where the architectural work includes "facelift" work with no HVAC upgrades in roughly half of the scope.

1
Thu Feb 19, 2015, 9:10 pm

share energy and water usage?

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Courtney Royal  on 

does it make sense to include instructions and options in the guidelines on how the future CS commercial owners can share their energy and water usage with USGBC?

1
Mon Nov 30, 2015, 5:16 pm

Local Food Production

Pilot-Credits SSpc82:Local food production
posted by  OSLEIDE WALKER  on 

Does anyone have any experience developing a successful Integrated Pest Management (IPM) Plan for this pilot credit. Do you know exactly what measures or components are required?

0

modeling VRF with DOAS

NC-2009 EAc1:Optimize Energy Performance
posted by  Brian Thornton  on 

Is there an accepted protocol for modeling in eQuest VRF systems with DOAS that does not require an exceptional calculation for seeking credit for EAc1?

1
Tue Feb 24, 2015, 3:40 pm

Are windows on one side, at large hall, sufficient?

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Anna Korinkova  on 

“Hello, I am working on IEQc8.2 (views) for large logistic center. The hall dimensions are 230x60 metres.

1
Tue Feb 24, 2015, 4:22 pm

LEED Online V4 problems

NC-2009 IDc2:LEED Accredited Professional
posted by  Susannah Goddard  on 

I am trying to claim this credit on the LEED Online v4 platform.

1
Wed Feb 18, 2015, 7:54 pm

Mixed Use, Mid Rise Residential, CO2 in units?

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Joanna Jenkins  on 

My firm has had success not including CO2 sensors in units of mid-rise residential project under LEED v3 NC.

0

Cutsheet unavailable

EBOM-v4 WEp1:Indoor water use reduction
posted by  Charalampos Giannikopoulos  on 

If manufacturer documentation is unavailable and the flow/fixture rate is unknown is it allowed to physically measure and time water consumption rates for at least a 20% of the fixtures of each fix

1
Tue Feb 24, 2015, 11:10 pm