Forum quick links
Liquid hand soaps/body wash
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Jutta Berns on
We have project that is using a liquid body wash that is technically a liquid hand soap too (purchased as both but in different packaging).
Tenant agreement to exclude PFP boxes
CS-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
In our project location, it is clear that no tenants will go for a heating system. The base building is also designed for cooling only.
Mechanical Boundary Differs from Overall Project Boundary
NC-2009 PIf2:Project Summary Detailsposted by John Havenstrite on
I am working on a project where the architectural work includes "facelift" work with no HVAC upgrades in roughly half of the scope.
share energy and water usage?
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Courtney Royal on
does it make sense to include instructions and options in the guidelines on how the future CS commercial owners can share their energy and water usage with USGBC?
Local Food Production
Pilot-Credits SSpc82:Local food productionposted by OSLEIDE WALKER on
Does anyone have any experience developing a successful Integrated Pest Management (IPM) Plan for this pilot credit. Do you know exactly what measures or components are required?
modeling VRF with DOAS
NC-2009 EAc1:Optimize Energy Performanceposted by Brian Thornton on
Is there an accepted protocol for modeling in eQuest VRF systems with DOAS that does not require an exceptional calculation for seeking credit for EAc1?
Are windows on one side, at large hall, sufficient?
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Anna Korinkova on
“Hello, I am working on IEQc8.2 (views) for large logistic center. The hall dimensions are 230x60 metres.
LEED Online V4 problems
NC-2009 IDc2:LEED Accredited Professionalposted by Susannah Goddard on
I am trying to claim this credit on the LEED Online v4 platform.
Mixed Use, Mid Rise Residential, CO2 in units?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Joanna Jenkins on
My firm has had success not including CO2 sensors in units of mid-rise residential project under LEED v3 NC.
Cutsheet unavailable
EBOM-v4 WEp1:Indoor water use reductionposted by Charalampos Giannikopoulos on
If manufacturer documentation is unavailable and the flow/fixture rate is unknown is it allowed to physically measure and time water consumption rates for at least a 20% of the fixtures of each fix