Healthcare-v4.1 MRc6: PBT Source Reduction - Lead, Cadmium, and Copper
Healthcare-v4.1 INc1:Innovationposted by Ann Busker on
Good morning,
Increased Ventilation 15% and 30% - does it count as 2 strategies?
CI-v4.1 EQc1:Enhanced Indoor Air Quality Strategiesposted by Lidia Johansen on
Hello
If we achieve increased ventilation by 30% - does it count as 2 strategies (15% and 30%)?
Thanks
Lidia
Does adding "green, pool and EV's" to parking onsite, yet outside our LEED Boundary, comply with these credits' intent?
Warehouses-NC-v4 LTc8:Green vehiclesposted by Blake Jackson on
I'm working on a 455,000gsf expansion of an existing facility, which will have all new/standalone systems to support the new wing.
How can a warehouse extension project (with no regularly occupied space) comply with EQp1?
Warehouses-NC-v4 EQp1:Minimum indoor air quality performanceposted by Blake Jackson on
I'm working on a 455,000gsf expansion of an existing facility, which will have all new/standalone systems to support the new wing.
Commissioning Authority
CI-v4 EAp1:Fundamental commissioning and verificationposted by padma priya on
Commissioning Authority - Please clarify this query.
Bicycle -credit doubts
NC-v4 LTc6:Bicycle facilitiesposted by Deva venkat on
Hi team, i have doubts in bicycle credit.my project location is Bangladesh government using common road for two wheeler and four wheelers. Here how i get points in bicycle credit.
Does this credit only apply to lighting fixtures installed on masts with mounting heights ?
NC-v4 SSc6:Light pollution reductionposted by Sara BENLOUBA on
Does this credit only apply to lighting fixtures installed on masts with mounting heights ?
So, consequently, could we exclude this 2 kinds of lighting fixtures:
MRpc87 Verified Construction and Demo Recycling Rates
NC-v4 INc1:Innovationposted by Marie Bizzak on
We are submitting for Pilot Credit 87 - Verified Construction & Demolition Recycling Rates. We have completed a. What is required for documentation and upload for b.
Certifying an exisiting building that is under construction for part of the performance period.
EBOM-v4.1 MPR3:Must comply with project size requirementsposted by Daniel Esposito on
If a project going for certification underwent construction retrofits for a significant portion of the performance period, does it still qualify for certification?