Forum quick links
Energy Performance Calculator - Group Approach
NC-2009 EAp2:Minimum Energy Performanceposted by Praveenbabu Rajkumar on
Hi All,
We are working in LEED NC v2009 project which is having multiple buildings and the project is going Group approach method.
Existing Building Glazing Details
NC-2009 EAp2:Minimum Energy Performanceposted by John on
Dear all,
Baseline HVAC System Type
NC-2009 EAp2:Minimum Energy Performanceposted by Michael Hammond on
Hi all,
Building system types vs square footage and non-predominant uses
NC-2009 EAp2:Minimum Energy Performanceposted by Richard Mathews on
I'm working on a project that totals approximately 178,000 sf, of which approximately 140,000 sf is office space (3 stories tall), with the other 38,000 sf being conditioned manufacturing space.
Modeling curtain walls
NC-2009 EAp2:Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
Good morning, I'd like to know if anyone can share there best approach to modeling a curtain wall.
Cooling tower fan power
NC-2009 EAp2:Minimum Energy Performanceposted by Saif Abdulameer on
Hi all, I am modeling a cooling tower the fan meets the requirement of Appendix G, but I am not sure what is the fan power should be used for the baseline, Should I use the same as proposed model
Minimum fresh air rates - Baseline vs. Proposed (90.1-2010)
NC-2009 EAp2:Minimum Energy Performanceposted by Greenlab on
Hello,
Hotel - Baseline HVAC Types
NC-2009 EAp2:Minimum Energy Performanceposted by Michael Hammond on
I am modelling a hotel project. After assigning the residential zones (bedrooms + access corridors) to System 1 – PTAC, there is approx.
Baseline HVAC system with 2 predominant spaces
NC-2009 EAp2:Minimum Energy Performanceposted by Yoyo Shek on
Dear All,