Two building served by one plant

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

We have a project that consists of two buildings. Both are served by one heating and cooling plant located in one of the building. Both buildings are new construction and are pursuing LEED.

5
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Nov 9, 2015, 4:20 pm

Modeling additions and alterations

NC-2009 EAp2:Minimum Energy Performance
posted by  Cory Duggin  on 

Table G3.1 section 2 a says one of the requirements to exclude parts from the model is that "Work to be performed in excluded parts of the building shall meet the requirements of Sections 5-10."

5
Senior Energy Wizard
TLC Engineering Solutions
LEEDuser Premium Member
44 thumbs up
Fri Nov 6, 2015, 9:09 pm

Airconditioning for process requirement

NC-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

Hi, We are working on a tablet manufacturing facility which is fully air conditioned (Only cooling, no heating requirement).

3
Tue Nov 3, 2015, 2:21 pm

Site lighting outside the LEED project boundary?

NC-2009 EAp2:Minimum Energy Performance
posted by  Anya Fiechtl  on 

Our project is within a larger property owned by the same entity, and some illuminated paths and roads extend beyond our LEED project boundary, so we're referencing CIR #10236, which allows expand

3
Architect
Buro Happold
LEEDuser Basic Member
55 thumbs up
Mon Nov 2, 2015, 5:49 pm

Baseline modeling for manufacturing facility

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Hi Markus and colleagues, There are few issues which I'd like to share, with a request for some advice related to the Baseline project modeling. The project in question is a manufacturing facility

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 27, 2015, 6:04 am

Existing building infiltration rates

NC-2009 EAp2:Minimum Energy Performance
posted by  Mike Fortier  on 

We are working on a major renovation of an existing building which includes removing the facade and replacing it with a highly efficient and tightly sealed facade system.

3
Mon Oct 26, 2015, 3:06 pm

Process load

NC-2009 EAp2:Minimum Energy Performance
posted by  Sasha Peters  on 

Can someone please tell what all components must be included in calculating the process load for any building? Can we include basement ventilation, electrical heating water system etc.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Mon Oct 12, 2015, 6:53 pm

Renovation Project (Envelope Question)

NC-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

The reviewer has asked us for the existing envelope conditions prior to retrofit to be modeled consistent with the requirements of ASHRAE 90.1-2007 Table G3.1.5(Baseline)(f) which says " For existi

3
SUSTAINABILITY COORDINATOR
JALRW Eng. Group Inc.
LEEDuser Basic Member
24 thumbs up
Wed Oct 7, 2015, 3:23 pm

Biomass for process steam

NC-2009 EAp2:Minimum Energy Performance
posted by  Melissa Merryweather  on 

I am working on a factory that uses process steam, which accounts for about half of the whole energy use.

2
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Sat Oct 3, 2015, 3:42 pm

Public Restrooms Definition (ASHRAE 90.1)

NC-2009 EAp2:Minimum Energy Performance
posted by  André Harms  on 

We are busy assessing whether or not the "Public lavatories have outlet temperature controls that limit the discharge temperature to 110°F" ASHRAE 90.1 Mandatory requirement.

4
Ecolution Consulting
LEEDuser Basic Member
1 thumbs up
Thu Oct 1, 2015, 4:17 pm