Forum quick links
Two building served by one plant
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have a project that consists of two buildings. Both are served by one heating and cooling plant located in one of the building. Both buildings are new construction and are pursuing LEED.
Modeling additions and alterations
NC-2009 EAp2:Minimum Energy Performanceposted by Cory Duggin on
Table G3.1 section 2 a says one of the requirements to exclude parts from the model is that "Work to be performed in excluded parts of the building shall meet the requirements of Sections 5-10."
Airconditioning for process requirement
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
Hi, We are working on a tablet manufacturing facility which is fully air conditioned (Only cooling, no heating requirement).
Site lighting outside the LEED project boundary?
NC-2009 EAp2:Minimum Energy Performanceposted by Anya Fiechtl on
Our project is within a larger property owned by the same entity, and some illuminated paths and roads extend beyond our LEED project boundary, so we're referencing CIR #10236, which allows expand
Baseline modeling for manufacturing facility
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Hi Markus and colleagues, There are few issues which I'd like to share, with a request for some advice related to the Baseline project modeling. The project in question is a manufacturing facility
Existing building infiltration rates
NC-2009 EAp2:Minimum Energy Performanceposted by Mike Fortier on
We are working on a major renovation of an existing building which includes removing the facade and replacing it with a highly efficient and tightly sealed facade system.
Process load
NC-2009 EAp2:Minimum Energy Performanceposted by Sasha Peters on
Can someone please tell what all components must be included in calculating the process load for any building? Can we include basement ventilation, electrical heating water system etc.
Renovation Project (Envelope Question)
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
The reviewer has asked us for the existing envelope conditions prior to retrofit to be modeled consistent with the requirements of ASHRAE 90.1-2007 Table G3.1.5(Baseline)(f) which says " For existi
Biomass for process steam
NC-2009 EAp2:Minimum Energy Performanceposted by Melissa Merryweather on
I am working on a factory that uses process steam, which accounts for about half of the whole energy use.
Public Restrooms Definition (ASHRAE 90.1)
NC-2009 EAp2:Minimum Energy Performanceposted by André Harms on
We are busy assessing whether or not the "Public lavatories have outlet temperature controls that limit the discharge temperature to 110°F" ASHRAE 90.1 Mandatory requirement.