Hi, We are working on a tablet manufacturing facility which is fully air conditioned (Only cooling, no heating requirement). More than 50% of the areas have RH less than 40% and temperature of 22degC to be maintained . The other 50% of the areas have a temperature requirement of 22degC and RH less than 60% to be maintained. Can we model identical air conditioning in base and proposed case for the areas with RH less than 40% requirement as these areas have AC for process requirement?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.