Low Emitting Materials - French Legislation Class A+
Retail-NC-v4 EQc2:Low emitting materialsposted by Ian McCall on
Hello all LEED V4 ers, LEED / USGBC have now accept International VOC / TVOC standards. LEED accepts the French class A+ formaldehyde limit value of 10 μg/m³ done at 28 days.
Do school buses contribute to the Option 2 rate
Schools-EBOM-v4 LTc1:Alternative transportationposted by R. Ted Krasnesky on
Do school buses contribute as a "ride share" option for students that contribute to the Option 2 alternative transportation rate?
Unoccupied Building
Data-Centers-NC-v4 MPR3:Must comply with project size requirementsposted by Phillip Cook on
I am working on a datacentre that does not include any occupied areas and will have no regular staff on site - security and network support will be provided from an adjoining site.
Trash can liner credit EBOM V4
Retail-EBOM-v4 EQc7:Green cleaning - products and materialsposted by Marion Stecklow on
What is the credit requirement for trash can liners in EBOM v4?
Maximum allowable concentration of formaldehyde and other VOCs
NC-v4 EQc4:Indoor air quality assessmentposted by Youyou Xiong on
Table 1 listed the maximum allowable concentrations for target chemicals but except formaldehyde. Why is formaldehyde an exception? Where is the 27 ppb from?
Rainwater harvesting
NC-v4 SSc4:Rainwater managementposted by Erin Holdenried on
Will rainwater harvesting prevent compliance with this credit?
Rainwater Management in Colorado
EBOM-v4 SSc2:Rainwater managementposted by Jonathan Miller on
Does anyone know what the rules are on engaging in rainwater management in Colorado? I'm under the impression that this is against the law in the state.
Number of cycles
EBOM-v4 WEc3:Cooling tower water useposted by Jonathan Miller on
What is the number of cycles necessary to achieve 1 point? 10?
Minimum Floors Requirement for EB:OM v4 Existing Building
EBOM-v4 MPR3:Must comply with project size requirementsposted by Davide Filippi on
I have a question! I'm a student here!
What is an "Existing Buiding" for EB:OM?
EBOM-v4 MPR2:Must use reasonable LEED boundariesposted by Davide Filippi on
An existing, old and close building (nobody insiede for years, no heating system working...) can pursue a LEED EB:OM v4 Existing building?