ISO requirements for EPDs
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Craig Graber on
Hi, this is Rebecca from Atelier Ten.
LEED boundary - urban infill project - LEED V4 C&S
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Thomas Gibbons on
Hi folks,
USGBC rainfall events calculator
NC-v4 SSc4:Rainwater managementposted by Leanne Niu on
We could not get the 10 years of the historic daily rainfall data, if we could leave the sheet of historical data blank? and how we calculate the total runoff we need to control on site?&
Carpet Tile as an Entryway System
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by James Keohane on
The Reference Guide for EQc1, Option 1- Entryway Systems describes entryway system in part ..…...
roof definition
NC-v4 SSc5:Heat island reductionposted by Gerren Wagner on
In the LEED certification glossary, a definition for roof is not given. Previously in v3, roof was defined as area covering occupiable space. For a v4 project, could roof areas that cov
software available to analysis LCA
NC-v4 MRc1:Building life-cycle impact reductionposted by Prakash Sekar on
What are the software available to analysis LCA credit
EAp2 Option 2 - 50% watts in Energy Star no longer required?
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by Gail Napell on
we're doing a hotel. Owner's preferred guestroom mini-frig is NOT Energy Star compliant (as you know, many appliances that used to be Energy Star no longer are under new requirements).
Air/water-resistive barrier VOC requirement
Schools-NC-v4 EQc2:Low emitting materialsposted by Coral Pais on
Is a fluid-applied air/water-resistive barrier considered a "waterproofing material" which must meet VOC requirements for exterior-applied products?
What if the project JUST uses only 1ea for each 20 EPD materials?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by J.W. Shin on
Hi,
What if the project JUST uses only 1ea for each 20 EPD materials?
Vertical Expansion v. Horizontal Expansion
Healthcare-v4 MRc8:Design for flexibilityposted by Mary Couch on
Hello! I'm working on a project and we can only achieve Modular/Movable Casework, Vertical Expansion and Horizontal Expansion.