Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent
4
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Tue Aug 13, 2019, 5:26 pm

Monitoring-based Cx for CS projects

CS-v4 EAc1:Enhanced commissioning
posted by  Shannon Oletic  on 

What are the required measurement points for a core and shell project?

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Aug 13, 2019, 5:09 pm
1
Fri Aug 16, 2019, 5:50 pm
2
LEED AP ID+C & BD+C
Ecoteric Ltd
LEEDuser Premium Member
1 thumbs up
Sun Aug 11, 2019, 10:30 pm

Enhanced Commissioning

NC-v4 EAp1:Fundamental commissioning and verification
posted by  saif eddine majdaoui  on 

We are working on a big project, we are the LEED subcontractor (consultant) of the general contractor (All trades), 

3
Regional Director
Horizon Engineering Associates
LEEDuser Premium Member
40 thumbs up
Sun Aug 11, 2019, 9:49 pm
2
Sun Aug 11, 2019, 9:26 pm

LEED v4 CI EAb Opt. Energy Perf. : Option 2 : AEDG Maximum Project Size requirements

CI-v4 EAc2:Optimize energy performance
posted by  Kristen Callori  on 

Our project is an existing 300,000 sf Office building. Our client is both the new owner and will be the sole tenant.

1
Fri Aug 9, 2019, 8:53 pm

minor improvements within the water body body buffers: grade changes necessary to ensure public access

NC-v4 LTc2:Sensitive land protection
posted by  Louise Schlatter  on 

Hi.  I have a question about minor improvements within the water body body buffer.  It says "grade changes necessary to ensure public access."  We have a small First Order strea

3
Fri Aug 9, 2019, 2:15 pm

FSC wood

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Hoda Ibrahim  on 

Can I use imported FSC wood as raw material and locally manufactured or FSC shall be locally harvested ?

1
Fri Aug 9, 2019, 1:43 pm

Option 1 - Flushout of Non-Occupied Spaces

NC-v4 EQc4:Indoor air quality assessment
posted by  Mike Bahr  on 

My project is a mid-rise building with the lower 5 levels being open air parking. Is that required to be flushed, and meet humidity and temperature requirements?

1
Fri Sep 13, 2019, 3:19 am