Topic | Recent |
---|---|
"..surface reflection and visibility of any surface 3 frit patterns.."Pilot-Credits SSpc55: Bird collision deterrenceposted by Maciej Starewicz on Aug 10, 2018, 6:51 am
In General Pilot Documentation Requirements we can find the following position:
Last reply: Stefan Knust, Mar 16, 2022, 11:58 am |
|
Open parking under the buildingCS-2009 IEQc5: Indoor Chemical and Pollutant Source Controlposted by Rasita Masalskyte on May 19, 2017, 9:54 am
Dear all, We have a case where an open parking garage is located on the ground floor (under the building). Apparently, no exchaust system can be applied in this case. Last reply: Dylan Connelly, Aug 30, 2017, 1:02 pm |
|
Car wash in parking garageEBOM-2009 WEc1: Water Performance Measurementposted by Rasita Masalskyte on Mar 1, 2017, 8:38 am
Hi all, We have a case where there is an office ("main" building) and a separate parking garage (that serves the office) within LEED project boundary. Last reply: Ben Stanley, Aug 29, 2017, 2:13 pm |
|
> 10% exemption possible?EBOM-2009 MPR2: Must be a complete, permanent building or spaceposted by Rasita Masalskyte on Apr 13, 2017, 9:37 am
Hello, Has anyone heard of possibility to exclude >10% of building gross area that is under separate ownership and management? In our case such space makes 14%. Although the... |
|
Filling the Minimum Performance Calculator for 100% OAEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Rasita Masalskyte on Feb 28, 2017, 11:43 am
SIngle 100% outdoor air... Last reply: Rasita Masalskyte, Mar 3, 2017, 5:27 am |
|
Outdoor air delivery monitor location?CS-2009 IEQc1: Outdoor Air Delivery Monitoringposted by Mindaugas Mi on Dec 21, 2016, 12:28 pm
Dear Leeduser.com members, who could explain where exactly should the outdoor air delivery monitor should be located? Only at the outdoor intakes? Before the filter media or after the filter... Last reply: Dylan Connelly, Jan 23, 2017, 9:58 am |
|
Solar panels serving another buildingEBOM-2009 SSc7.2: Heat island effect - roofposted by Rasita Masalskyte on Jan 17, 2017, 2:11 am
If solar panels on our building‘s roof are serving another building‘s energy needs, can we still exclude these solar panels from calculations as mechanical equipment? I.e., our building... Last reply: Trista Brown, Jan 17, 2017, 4:21 pm |
|
Control devices required for meeting ASHRAE 55CS-2009 IEQc7: Thermal comfort - designposted by Mindaugas Mi on Dec 21, 2016, 12:56 pm
Dear Leeduser.com members. We have a question regarding whether we need these controls for meeting LEED credits under v2009 CS version. - Radiator heating system. Valves are... Last reply: Scott Bowman, Jan 12, 2017, 6:19 pm |
|
Reasonable Site BoundaryCS-2009 MPR3: Must use a reasonable site boundaryposted by Mindaugas Mi on Dec 21, 2016, 1:29 pm
Dear Leeduser.com members. I have a question regarding correct LEED boundary. 1. The building is being built on the whole site area (3 underground stories) |
|
Top level parking_Option 1NC-v4 SSc5: Heat Island Reductionposted by Rasita Masalskyte on Jan 26, 2016, 6:54 am
Hello, We're pursuing Option 1. Nonroof and roof. Last reply: Ashwini Arun, Jan 27, 2016, 10:38 am |