Hi,

We are performing energy modelling for an airport. We have the Heat Load Summary Sheet where the Minimum Outdoor Air Requirement is taken with 30% excess to ASHRAE 62.1 requirement. Do we input the fresh air for low side equipments in model with 30% excess fresh air?