Scope of workGeneral forumsposted by Tristan Roberts on Jun 17, 2010, 4:44 pm
If you haven't already done so, check out the LEED rating system selection guidance document. This might point you in a specific... Last reply: Amanda Roelle, Jun 17, 2010, 5:26 pm |
|
conversion “and/or” replacementEBOM-2009 EAp3: Fundamental Refrigerant Managementposted by John Beeson on Jun 17, 2010, 1:53 pm
As stated under "Economic Analysis" in Bird's Eye View, "...the LEED Reference Guide says to analyze conversion “and/or” replacement, many project teams don’t perform a complete analysis and fail... Last reply: Tristan Roberts, Jun 17, 2010, 4:35 pm |
|
alternative path with signatoriesGeneral forumsposted by Tristan Roberts on Jun 15, 2010, 12:34 pm
Chris, we recently had a similar question come up in a forum on "owner signatories." I would recommend you check it out, and post if you have more thoughts... Last reply: Leo van Veldhuizen, Jun 17, 2010, 3:13 pm |
|
Steam Process loadsEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Heidi Creighton on Jun 16, 2010, 6:40 pm
Are steam process loads such as cage washing and glass cleaning included in these calculations and do they need to be monitored and included in the EUI values? How about domestic hot water... Last reply: Chris Nixon, Jun 17, 2010, 10:45 am |
|
Number of Cleaning DaysEBOM-2009 IEQc3.1: Green cleaning - high performance green cleaning programposted by Patrick Krywko on Jun 15, 2010, 9:10 pm
I see no reaosn that a cleaning contractor cannot provide services on a 3 day per week basis, assuming a 5 day work week. As long as cleanliness levels are maintained at an... Last reply: Tristan Roberts, Jun 16, 2010, 2:58 pm |
|
Conversion gpm at 60psiNC-2009 WEp1: Water Use Reductionposted by Tatjana Ernst on Jun 16, 2010, 5:07 am
Hi everyone, i have problems with the conversion of the flow rate. In Amerika the unit for flow rate of lavatory is gpm at 60 psi but in germany the flow rate is measured in l/min at 3bar... Last reply: Josephine de Montmarin, Jun 16, 2010, 5:47 am |
|
Case 1, Option 1NC-2009 SSc6.1: Stormwater design - quantity controlposted by Randall Brookshire on Jun 15, 2010, 10:27 am
There is a point of contention within my office that I'm hoping can be cleared up by posting here. When considering the "1- and 2-year 24-hour design storms", is it possible to meet the quantity... Last reply: Jean Marais, Jun 16, 2010, 2:40 am |
|
City-owned streetlights within site boundaryEBOM-2009 SSc8: Light Pollution Reductionposted by Jordan Smith on Jun 14, 2010, 4:44 pm
Our project has exterior lighting that is fully shielded, however a few streetlamps on the project boundary emit ample light to the night sky. These lamps are on the sidewalk, but technically... |
|
Unit Cost for PV Energy Cost SavingsNC-2009 EAc2: On-Site Renewable Energyposted by charles bertuch on Jun 7, 2010, 1:25 pm
Our project will include a substantial (20+ KW) PV system. We are trying to determine what our options are related to the electrical unit cost ($/KWH) used to calculate savings under EAc1 and... Last reply: Shillpa Singh, Jun 14, 2010, 1:48 pm |
|
Refrigerant ChargeNC-2009 EAc4: Enhanced Refrigerant Managementposted by Kenneth Lynch on Jun 9, 2010, 10:32 am
I'm confused about the Refrigerant Charge as a requirement for this credit. The language of the LEED 2009 manual in the "Select Equipment with Efficient Refrigerant Charge" paragraph under... Last reply: Shillpa Singh, Jun 14, 2010, 1:38 pm |