Log in
Forum
Topic

Pilot Credit EApc106 ISO 50002 Energy Audit

EBOM-v4 INc1: Innovation
posted by David Alemany on May 30, 2024, 11:06 am

If this pilot credit was part of a pre-requisite or credit perhaps the advantages and disadvantages could be explained of using ISO 50002 or ASHRAE Procedures to carry out energy audits for the...

Pilot Credit – Local Food Production

EBOM-v4 INc1: Innovation
posted by Amanda Tullos on May 30, 2024, 1:32 pm

We are trying to pursue Pilot Credit – Local Food Production, but we are not sure how the Site-specific...

Innovation: WELL Features

NC-v4 INc1: Innovation
posted by Laura Heagler on Jul 30, 2021, 12:27 pm

This innovation credit awards a point for complying with WELL Feature 87: Beauty and Design. The WELL Building Standard requires a professional narrative describing the incorporation of design...

Last reply: Deborah Lucking, May 30, 2024, 12:06 pm

Density Calculation

NC-v4 LTc4: Surrounding density and diverse uses
posted by Ahmed Abdul Rahman on May 16, 2024, 7:27 am

Emily Purcell Sustainable Design Lead CannonDesign LEEDuser Expert 349 thumbs up May 16, 2024- 10:51 am Total building floor area means the area of each floor, that is, the total square footage of space within the building.  Log in or register to post comments Joseph Kong LEEDuser Premium Member May 30, 2024- 10:04 am Hi Emily Purcell  I  am calculating Total Buildable Land, but I have read the forum that the 400m radius is not supposed to be a circle shape. Can you share the way how you demarcate the Total Buildable Land with 400m radius. Log in or register to post comments ...

Last reply: Joseph Kong, May 30, 2024, 10:04 am

Entryway Systems

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Lara Ibarra on Sep 15, 2020, 3:41 pm

Hi everyone,

For the entryway systems, the guide doesn't specify if it has to be installed inside and/or outside the building's entrance. Does anyone know if it can be installed 5 feet...

Last reply: Andrey Kuznetsov, May 30, 2024, 3:37 am

Pilot Credit: Prevention Through Design Comment

Pilot-Credits IPpc93: Prevention through design
posted by Afogreen Build on May 30, 2024, 12:48 am

To comply with this credit, the project team should fill out the Prevention Through Design worksheet (PtD) for Life Cycle Safety and Health, which is divided into two stages: Operation &...

Group Approach?

LEED Rating System Selection
posted by Santiago Avila on May 27, 2024, 10:42 am

Hello everyone,

I am currently working on a project consisting of two residential towers (deep retrofit). Although they appear to be connected from the outside, the only connection...

Last reply: Glen Boldt, May 29, 2024, 11:51 pm

Products applied offsite and non-Occupied spaces

NC-v4.1 EQc2: Low-emitting materials
posted by elias eid on May 28, 2024, 4:31 am

Hi all;

I would ask if the products applied offsite such as(paint for steel structural sections, Aluminum profiles, Wooden doors,...)

and products applied within non-occupied spaces...

Last reply: Andrey Kuznetsov, May 29, 2024, 10:25 pm

Modeling a backup District energy source

CS-2009 EAp2: Minimum Energy Performance
posted by Florian Pingaud on Dec 9, 2014, 6:41 am

Dear All,

I am requesting help on the energy modeling protocol for a building both connected to a stand-alone plant and a...

Last reply: Andrey Kuznetsov, May 29, 2024, 9:08 am

Calculations or descriptions

NC-2009 EAc5: Measurement and Verification
posted by Barbara Aguirre Garcia on May 24, 2024, 3:25 pm

For credit, is it necessary to make calculations within the plan, regarding the baseline calculation, the reporting period? Or is it just describing the elements to do the calculations? How is it...

Last reply: Marcus Sheffer, May 28, 2024, 12:38 pm