ADC- Alternative Daily CoverNC-v4.1 MRc5: Construction and demolition waste managementposted by Catherine Blakemore on Feb 2, 2023, 9:25 am
Does ADC have to be included in the overall waste total for Option 2 or is it just factor into the overall total for Option 1 only? -If Option 2 is selection on the LEED Online form the... Last reply: Dave Hubka, Feb 2, 2023, 9:28 am |
|
Abandoned or Blighted Building: Calculate Interior Finish Elements?NC-v4 MRc1: Building life-cycle impact reductionposted by Summer Minchew on Feb 1, 2023, 3:00 pm
My project is the major renovation of a building that has been abandoned for almost 20 years. 99% of the existing... |
|
LED Wall washer calculationLEED v4.1 Discussion Forumposted by Martina Vázquez on Feb 1, 2023, 6:35 am
Good morning, I've been studing LEED v4.1 document and it is almost all of it for streetlight projects, but we have a proposal based in wall-washer the exterior facade. I don't really know... |
|
Cities with composting mandates should have streamlined documentationPilot-Credits SSpc129: Comprehensive Compostingposted by Adhamina Rodriguez on Sep 16, 2021, 3:09 am
Like the Alternative Compliance Path for California projects meeting CALGreen code, cities that have composting ordinances in place should have it easier to document this credit. Last reply: Michelle Rosenberger, Jan 31, 2023, 6:17 pm |
|
Do materials in building services count as 'permanently installed'?NC-v4.1 MRc3: Sourcing of Raw Materialsposted by Cecilia Lopez-Cotarelo on Oct 18, 2022, 6:44 am
Do the materials used in the building services count a permanently installed materials when calculating the costs? I am working on a project where services make up a large proportion of the cost... Last reply: Lawrence Rennell, Jan 31, 2023, 5:26 pm |
|
Electrical service requirement for dual port Level 2 chargersCS-v4.1 LTc8: Electric Vehiclesposted by Natalie Terrill on Apr 8, 2022, 12:27 pm
The current language requires a Level 2 charging capacity with 208-240 volts or greater for each space. In the past we've installed conduit and wiring for dual chargers (1 charger using... Last reply: Andrea Vickers, Jan 31, 2023, 10:56 am |
|
Defining a baseline buildingNC-v4.1 MRc1: Building life-cycle impact reductionposted by Cecilia Lopez-Cotarelo on Jan 30, 2023, 12:41 pm
Hello, I am carrying out an LCA for an EU-based project and am confused as to how to establish a baseline to compare improvements in the carbon footprint. The project is currently... Last reply: Camilo Velez, Jan 31, 2023, 10:40 am |
|
Connector Service to other bus routesCS-v4 LTc5: Access to quality transitposted by Nadia Azzam on Jan 30, 2023, 4:09 pm
I am working on a project with one of the stops serving a connector service. This is basically a bus route that connects to other routes. Can we count the other routes it connects to since... |
|
Regarding Energy SimulationNC-v4 EAc2: Optimize Energy Performanceposted by Nagaraj Sankar on Jan 30, 2023, 11:45 pm
In one of our LEED ID+C project, we are having scope of 8th floor and the total floor of the building is 12 floor. Last reply: Marcus Sheffer, Jan 31, 2023, 9:21 am |
|
Receipt Proof RequirementsNC-2009 MRc3: Materials Reuseposted by jupiter luner on Jun 19, 2018, 11:17 am
I wanted to clarify something that I recently heard from a contractor on a LEED project. For a number of the MR credits the receipts are required for the project. Typically, we... Last reply: Andrea Vickers, Jan 31, 2023, 9:20 am |