Relevant Trades/Contractors at Project Planning Stage

Pilot-Credits IPpc81: Green training for contractors, trades, operators and service workers
posted by Charles Boechler on Aug 16, 2023, 3:27 pm

From a contract perspective engagement of the professionals is difficulty due to the contract and level of awarenss at planning stages. We have a challenge getting certainty of the key...

How many tests per square foot?

NC-v4 EQc4: Indoor air quality assessment
posted by Samantha Lee on Jun 10, 2020, 1:43 pm

Hi all! 

I cannot find the reference point in the USGBC Reference Guide or in the standards where it states the amount of tests required per square foot for LEED version 4. Is it 1...

Last reply: Brian Salazar, Aug 16, 2023, 2:06 pm

Interior element reuse in different project

CI-v4 MRc2: Interiors life-cycle impact reduction
posted by Nadia Azzam on Aug 16, 2023, 1:33 pm

Our project is demolishing a wall partition which is going to be reused on a different project (not the one applying for LEED). In this case, can the first project claim points under LEED's...

Minimum Survey respond reached but no score avilable

EBOM-v4.1 LTp1: Transportation Performance
posted by Michael Ling on Apr 13, 2023, 11:00 pm

Good Day ! I would like to ask if anyone experienced that before: 

I have a project requested minium 95 survey respond, however after reached the min required respond there is no update on...

Last reply: Levi Jimenez, Aug 16, 2023, 11:29 am

Are there any Sunset Dates for v4.0 (since v4.1 is now active)? 2Qs

LEED v4.1 Discussion Forum
posted by Jenni Betancourt on Mar 23, 2020, 3:06 pm

I have a very large project that will not start construction until 2022 or 2023 and it will be under construction for several years. I therefore want to be careful about sunset...

Last reply: Dave Hubka, Aug 15, 2023, 3:40 pm

Lighting Control- Recording Studio

CI-v4 EQc6: Interior lighting
posted by Edgar Arevalo on Aug 15, 2023, 2:41 pm

I have a library project that has a recording studio in the basement.  After reviewing the lighting control drawing, the space only have an ON/OFF switch with vacancy sensor.  After checking this...

Option 2. Prescriptive Compliance

CI-v4 EAp2: Minimum Energy Performance
posted by Dave Hubka on Oct 15, 2021, 10:45 am

kinda embarrassed to ask this one, but here goes...

The ref guide and credit template require the team to upload the Target Finder performance results when pursuing Option 2. Prescriptive...

Last reply: Michelle Rosenberger, Aug 15, 2023, 11:51 am

LEED Certification for an Existing Building

LEED v4.1 Discussion Forum
posted by Mary Christel Eugenio on Aug 15, 2023, 7:57 am

Hi,
Is there a closing date for v4 now that we have v4.1?
We'll be registering for the LEED Certification of one of our properties for the first time.
Should we go for v4 or v4....

Furniture

NC-v4 MRc5: Construction and demolition waste management
posted by Alexandra Kravel on Aug 14, 2023, 12:28 pm

We are working on a partial renovation for a college building. The different sections of the building have not been demolished yet, but the General Contractor is in the process of removing...

Furniture

NC-v4 MRp2: Construction and demolition waste management planning
posted by Alexandra Kravel on Aug 14, 2023, 12:26 pm

We are working on a partial renovation for a college building. The different sections of the building have not been demolished yet, but the General Contractor is in the process of removing...