Topic | Recent |
---|---|
Relevant Trades/Contractors at Project Planning StagePilot-Credits IPpc81: Green training for contractors, trades, operators and service workersposted by Charles Boechler on Aug 16, 2023, 3:27 pm
From a contract perspective engagement of the professionals is difficulty due to the contract and level of awarenss at planning stages. We have a challenge getting certainty of the key... |
|
How many tests per square foot?NC-v4 EQc4: Indoor air quality assessmentposted by Samantha Lee on Jun 10, 2020, 1:43 pm
Hi all! I cannot find the reference point in the USGBC Reference Guide or in the standards where it states the amount of tests required per square foot for LEED version 4. Is it 1... Last reply: Brian Salazar, Aug 16, 2023, 2:06 pm |
|
Interior element reuse in different projectCI-v4 MRc2: Interiors life-cycle impact reductionposted by Nadia Azzam on Aug 16, 2023, 1:33 pm
Our project is demolishing a wall partition which is going to be reused on a different project (not the one applying for LEED). In this case, can the first project claim points under LEED's... |
|
Minimum Survey respond reached but no score avilableEBOM-v4.1 LTp1: Transportation Performanceposted by Michael Ling on Apr 13, 2023, 11:00 pm
Good Day ! I would like to ask if anyone experienced that before: I have a project requested minium 95 survey respond, however after reached the min required respond there is no update on... Last reply: Levi Jimenez, Aug 16, 2023, 11:29 am |
|
Are there any Sunset Dates for v4.0 (since v4.1 is now active)? 2QsLEED v4.1 Discussion Forumposted by Jenni Betancourt on Mar 23, 2020, 3:06 pm
I have a very large project that will not start construction until 2022 or 2023 and it will be under construction for several years. I therefore want to be careful about sunset... Last reply: Dave Hubka, Aug 15, 2023, 3:40 pm |
|
Lighting Control- Recording StudioCI-v4 EQc6: Interior lightingposted by Edgar Arevalo on Aug 15, 2023, 2:41 pm
I have a library project that has a recording studio in the basement. After reviewing the lighting control drawing, the space only have an ON/OFF switch with vacancy sensor. After checking this... |
|
Option 2. Prescriptive ComplianceCI-v4 EAp2: Minimum Energy Performanceposted by Dave Hubka on Oct 15, 2021, 10:45 am
kinda embarrassed to ask this one, but here goes... The ref guide and credit template require the team to upload the Target Finder performance results when pursuing Option 2. Prescriptive... Last reply: Michelle Rosenberger, Aug 15, 2023, 11:51 am |
|
LEED Certification for an Existing BuildingLEED v4.1 Discussion Forumposted by Mary Christel Eugenio on Aug 15, 2023, 7:57 am
Hi, |
|
FurnitureNC-v4 MRc5: Construction and demolition waste managementposted by Alexandra Kravel on Aug 14, 2023, 12:28 pm
We are working on a partial renovation for a college building. The different sections of the building have not been demolished yet, but the General Contractor is in the process of removing... |
|
FurnitureNC-v4 MRp2: Construction and demolition waste management planningposted by Alexandra Kravel on Aug 14, 2023, 12:26 pm
We are working on a partial renovation for a college building. The different sections of the building have not been demolished yet, but the General Contractor is in the process of removing... |