Log in
Forum
Topic

Case 2. Systems unable to meet required outdoor airflow rates

EBOM-v4 EQp1: Minimum indoor air quality performance
posted by Francesco Passerini on Mar 20, 2018, 6:11 am

I don't understand Case 2.

If meeting the outdoor airflow rates in Case 1 is not feasible because of the physical constraints of the existing ventilation system (...). Supply the maximum...

Last reply: Santiago Avila, Aug 23, 2023, 5:41 am

Sharing your WBLCA experience.

NC-v4 MRc1: Building life-cycle impact reduction
posted by Thais Sartori on Jul 18, 2021, 9:39 pm

Hello LEED users community!

I am Thais Sartori from the School of Architecture & Built Environment, Queensland University of Technology (QUT) - Australia. I’m reviewing the application...

Last reply: Tracy Marquis, Aug 22, 2023, 11:00 am

Minimum Energy Performance

CI-v4 EAp2: Minimum Energy Performance
posted by Nagaraj Sankar on Aug 22, 2023, 8:09 am

As we have a VRF system for fresh air, we design a seperate proposed case system module for the fresh air system. Is base case system is required in this scenario should also be taken into...

Last reply: Marcus Sheffer, Aug 22, 2023, 10:57 am

Bring in the outside air in freezer space

Warehouses-NC-v4.1 EQp1: Minimum indoor air quality performance
posted by Eric Kim on Mar 27, 2023, 2:39 am

Hello all,

Our team take cold warehouse project,  i have a one question.

Cold storage setting point: -10℃(14F)

in front storage, there are freezer space, : 5℃(41F)...

Last reply: Emma Loris, Aug 21, 2023, 10:59 pm

Test report more than 3 years old

NC-v4.1 EQc2: Low-emitting materials
posted by Allen Cornett on Oct 6, 2022, 3:17 pm

Has anyone use a report mor than 3 years old to show compliance with LEED v4.1...

Last reply: Allen Cornett, Aug 21, 2023, 5:38 pm

Testing Equipment for Option 2

NC-v4 EQc4: Indoor air quality assessment
posted by Gregory Patton on Aug 17, 2023, 6:56 pm

Does anyone have a rec for simple testing equipment to meet Option 2?

Thanks!

Last reply: Paula Melton, Aug 17, 2023, 10:15 pm

Water Calcultion for Commerical ID+C project

CI-v4 WEc1: Indoor water use reduction
posted by Amgad Khattab on Aug 16, 2023, 7:51 am

We have a project with the following :

- Tenet space has not any WC [Toilets] in the tenet space. but they are using the WC in the core area.

Hint:

- the building containing...

Last reply: emily reese moody, Aug 17, 2023, 2:03 pm

Additional Source Control and Monitoring; sensor locations

NC-v4.1 EQc1: Enhanced indoor air quality strategies
posted by Chris Flint Chatto on Aug 16, 2023, 4:33 pm

Wondering what this credit requires for location of...

Downstream Implementation of Analysis Outcomes

Pilot-Credits INpc113: Informing Design Using Triple Bottom Line Analysis
posted by Charles Boechler on Aug 16, 2023, 3:34 pm

This is such a critical part of informing plan decisions in relation to the marketplace value or buyer acceptance. I am curious how value engineering exercise at the construction stage has...

Seed Evaluator Tool Effectiveness?

Pilot-Credits IPpc89: Social equity within the community
posted by Charles Boechler on Aug 16, 2023, 3:20 pm

Is the Seed Evaluator the best tool for measuring social equity?

A challenge for us in addressing social equity in plan development is engagement of the existing community is often not...