As we have a VRF system for fresh air, we design a seperate proposed case system module for the fresh air system. Is base case system is required in this scenario should also be taken into seperate or both base and proposed case is modelled identically?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.