Topic | Recent |
---|---|
Systems requiring meteringCS-v4 EAc3: Advanced Energy Meteringposted by Tim Nabholz on Apr 4, 2017, 11:20 am
Hi All, I am pursuing this credit for a LEED v4 Core and Shell project and am having trouble determining which systems require meters. The credit requirements state "Install advanced... Last reply: Tariq Muhammad, Oct 16, 2023, 1:49 pm |
|
"Case 2, Option 2: Benchmarking against Historical Data"EBOM-v4 EAp2: Minimum Energy Performanceposted by Ramon Christopher Medrano on Oct 16, 2023, 1:30 am
We like to seek for an advice for EAp2: Minimum Energy Performance, we are pursuing "Case 2, Option 2: Benchmarking against Historical Data" our quarries are listed below: ...Last reply: Dave Hubka, Oct 16, 2023, 1:41 pm |
|
Rainwater management infrastructure availabilityNC-v4 SSc4: Rainwater managementposted by Emmanuel Pauwels on Feb 13, 2019, 7:08 am
What happens when a rainwater tank, designed to keep the required amount of rainwater is faced with a second stormevent? Does USGBC require demonstration of drawdown of the rainwater tank? Last reply: Gustavo De las Heras Izquierdo, Oct 14, 2023, 6:42 pm |
|
Do we have the possibility of combining the two requirements between 2 options of Glare?NC-v4.1 EQc6: Interior lightingposted by Sara BENLOUBA on Aug 7, 2023, 5:45 am
Dear All, We are looking for a clarification regarding the EQ credit "Interior Lighting" – of LEED V4.1, about option “GLARE CONTROL”. Do we have the possibility of combining the... Last reply: Umesh Atre, Oct 14, 2023, 10:57 am |
|
Reviewer requires cutsheetsNC-v4 EQc6: Interior lightingposted by Edgar Arevalo on Oct 13, 2023, 1:58 pm
Ok so I get a comment from the LEED reviewer asking for cutsheets of the lighting fixtures to back up the strategies I'm pursuing for the Lighting Quality section of this credit. I need to ask,... Last reply: Umesh Atre, Oct 13, 2023, 5:21 pm |
|
Reviewer requires cutsheetsCI-v4 EQc6: Interior lightingposted by Edgar Arevalo on Oct 13, 2023, 1:56 pm
Ok so I get a comment from the LEED reviewer asking for cutsheets of the lighting fixtures to back up the strategies I'm pursuing for the Lighting Quality section of this credit. I need to ask,... |
|
Glare Control for Regularly Occupied SpacesNC-v4.1 EQc6: Interior lightingposted by Lauren Kottis on Feb 7, 2022, 9:58 am
"For all regularly occupied spaces, meet one of the following requirements:
Last reply: Sara BENLOUBA, Oct 13, 2023, 11:14 am |
|
Process waterNC-v4 IPc1: Integrative processposted by Geetha J on Oct 12, 2023, 8:25 am
Hi everyone, Should we consider the cooling tower... Last reply: Dave Hubka, Oct 13, 2023, 10:25 am |
|
Building Reuse Option 3 on Shell buildings-- LEED C/S v4- new guidance on interiors and finishCS-v4 MRc1: Building life-cycle impact reductionposted by Landry Watson on Oct 12, 2023, 2:21 pm
We are getting some comments from the reviewer that indicate 1) We must include surfaces of interior non-structural walls in our calcs (this is new from other versions guidance) and 2) that we... |
|
Regarding Cooling Tower Water UseCS-v4 WEc3: Cooling tower water useposted by Nagaraj Sankar on Oct 11, 2023, 12:29 am
Hi, In our LEED V4 BD+C Core and Shell project for a 12-story office building, we modeled a water-cooled chiller in the base case (As per ASHRAE 90.1 - System 8). However, in the... Last reply: Dave Hubka, Oct 12, 2023, 8:53 am |