Topic | Recent |
---|---|
Blower Door TestingNC-v4.1 EAc1: Enhanced Commissioningposted by Cam Burkacki on Jan 31, 2024, 8:58 am
Hi all, Very simple question here that I can't seem to find a straight answer on. Wondering whether blower door testing is a requirement for the envelope comissioning process, or whether... |
|
GHG calculations ACP for Carbon offsetNC-v4 EAc7: Green power and carbon offsetsposted by Charline SEYTIER on Dec 4, 2017, 1:54 pm
Hi everyone Has any of you used the http://www.ghgprotocol.org/calculation-tools to determine the quantity of mtCO2e needed to... Last reply: Michaël Briffaz, Jan 31, 2024, 8:52 am |
|
Easily Achievable Where Mandates are in PlacePilot-Credits SSpc129: Comprehensive Compostingposted by Marsha Gentile on Jun 15, 2023, 4:29 pm
This pilot credit is easily achievable where mandates and infrastructure (by municipality and/or... Last reply: Mario Kranzl, Jan 31, 2024, 7:16 am |
|
Can I obtain the Access to Quality Transit in multiple buildings sharing a main controlled entrance?NC-v4.1 LTc5: Access to quality transitposted by Zabdi Valdez on Mar 14, 2023, 6:01 pm
I'm working with an industrial park with multiple buildings (5) individually certified which has two bus stops located within 1/4 mile of the main entrance and enough bus trips. The park has an... Last reply: David O'Connell, Jan 31, 2024, 4:25 am |
|
Using BPFs from ASHRAE 90.1-2022 instead of 90.1-2016NC-v4.1 EAp2: Minimum Energy Performanceposted by Mark Benson on Jan 29, 2024, 5:07 pm
In the November 2023 issue of ASHRAE Journal, members of the 90.1 committee stated that 60% of the BPFs in ASHRAE 90.1-2022 have become less stringent than those in 2019 and some are even less... Last reply: Mark Benson, Jan 30, 2024, 8:41 am |
|
Seeking Insights on Implementing All Gender Restrooms (WEpc147) Pilot CreditNC-v4.1 INc1: Innovationposted by Teresa Cortes on Jan 29, 2024, 3:01 pm
Hello LEED Community, I'm involved in a project pursuing the WEpc147 All Gender Restrooms pilot credit. Our aim is to create inclusive and comfortable restroom facilities for all users,... |
|
State Verification ProgramPilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Vanessa Hostick on Jan 29, 2024, 3:13 pm
Has anyone tried submitting with a state led auditing and verification program? The credit criteria state rates and facilities must be reveiwed by a "qualified third-party organization" ...... |
|
Template?CS-v4 SSc7: Tenant Design and Construction Guidelinesposted by Erin Holdenried on Jan 29, 2024, 1:41 pm
Is there a template available for this credit? Thanks! |
|
v4.1 EPD Option 2 (optimization)- no viable way to mandate this in construction specs!NC-v4.1 MRc2: Environmental Product Declarationsposted by Joanna Switzer on Apr 17, 2020, 2:38 pmJuly 17, 2023- 3:43 pm On this forum it was recently brought to our attention that the format that the Allegion optimized EPD reports no longer met the requirements of USGBC. We worked with our... Last reply: Lauren Richardson, Jan 29, 2024, 10:14 am |
|
Diverse Use Category ClarificationCI-v4 LTc2: Surrounding density and diverse usesposted by on Aug 10, 2023, 9:51 am
For the Surrounding diversity and... Last reply: Deborah Lucking, Jan 26, 2024, 8:18 pm |