Topic | Recent |
---|---|
Where and how install the meters in a in a new multi-use construction?NC-v4 EAp3: Building-level energy meteringposted by Sara BENLOUBA on Dec 15, 2021, 11:04 am
Dear all, We have a tower with multi-storey building, made up of 3 components: Offices, hotel and residential. We follow as a reference the " BD+C NC " The metering will be separate... Last reply: Marcus Sheffer, Dec 16, 2021, 9:17 am |
|
Project with DESNC-v4 EAc4: Demand responseposted by Ricardo Sá on Nov 24, 2021, 4:21 am
Dear All, we’re currently involved in the LEED certification of an office building, located in a Campus. For purposes of minimum energy performance (pre-requisite and credit),... Last reply: Tyler Thumma, Dec 16, 2021, 8:55 am |
|
Zone Isolation in HotelsHospitality-NC-v4 EAp2: Minimum Energy Performanceposted by Ricardo Sá on Oct 29, 2021, 6:54 am
Dear All, According to ASHRAE 90.1 - 2010 mandatory provision 6.4.3.3.4 Zone Isolation, "HVAC systems serving zones that are intended to operate or be occupied nonsimultaneously shall be... Last reply: Tyler Thumma, Dec 16, 2021, 8:41 am |
|
Fan Powered Box Metering CategoryCI-v4 EAc3: Advanced Energy Meteringposted by Daniel Thien on Oct 4, 2021, 11:47 am
We have a building that uses fan-powered boxes with integral electric heaters to serve each zone. The fan-powered boxes come from the manufacturer with one electrical connection point, and the... Last reply: Tyler Thumma, Dec 15, 2021, 3:39 pm |
|
Water-cooled chiller connected to campus DESNC-v4 EAp2: Minimum Energy Performanceposted by Ajit Naik on Sep 22, 2021, 10:07 am
Working on a model of a 3-floor, 96,000 SF archival facility on a campus. Dehumidification is very important and provided by low-dewpoint supply air. The air is cooled by 35F chilled water/glycol... Last reply: Tyler Thumma, Dec 15, 2021, 3:33 pm |
|
ENERGY MODEL FOR OFFICE IN BASEMENTCI-v4 EAp2: Minimum Energy Performanceposted by S S on Sep 24, 2021, 3:35 am
Hello to All, Greetings! I am doing the energy model for Office Building which has located in Basement. In our software, U value only can be given as input. In this case,... Last reply: Tyler Thumma, Dec 15, 2021, 2:07 pm |
|
Residential Exhaust (toilet and kitchen)NC-v4 EAp2: Minimum Energy Performanceposted by Michelle Christopher on Aug 30, 2021, 12:08 pm
Hello, I'm trying to get some cliarity regarding residential zone exhaust (from toilet exhaust and kitchen exhaust). Looking at the multifamily guidelines "Supply and exhaust fans that... Last reply: Tyler Thumma, Dec 15, 2021, 1:26 pm |
|
Modeling Occupancy Sensors for lightingNC-v4.1 EAp2: Minimum Energy Performanceposted by Saif Alsaeed on Aug 16, 2021, 5:24 pm
I am working on a 90.1-2016 App G energy model. The schedules in ASHRAE 90.1 User’s Manual indicates that the lighting schedule reflects mandatory occupancy sensors requirements of section 9.4.... Last reply: Tyler Thumma, Dec 15, 2021, 1:15 pm |
|
Shower Facilities- 200 yard requirementNC-v4.1 LTc6: Bicycle facilitiesposted by Theresa Lehman on Dec 15, 2021, 9:56 am
In LEED v4, the 200 yard requirement was removed for shower facilities. I'm working on a rural/suburban university project where the project more than meets the short-term and long-term secure... Last reply: Dave Hubka, Dec 15, 2021, 10:19 am |
|
Prevention through Design- BOD e OPRPilot-Credits IPpc93: Prevention through designposted by Adriana Hansen on Jun 10, 2021, 5:14 pm
Hello, We are trying to get credit on a project and would like to know if the items studied for credit need to be described in the... Last reply: Dionisio Franca, Dec 14, 2021, 11:02 pm |