Topic | Recent |
---|---|
PIF Not Approved but Review Notes indicate that Documentation Demonstrates ComplianceNC-2009 PIf3: Occupant and Usage Dataposted by Aurora Smith on May 4, 2022, 5:47 pm
There was a discrepancy for the total number of occupants in IEQp1 in the intial design submission which was corrected for the design final submission. (We double checked that the numbers are... Last reply: Summer Minchew, May 6, 2022, 9:39 am |
|
Exemplary Performance?CI-v4.1 LTc3: Access to quality transitposted by Erin Holdenried on May 5, 2022, 3:20 pm
It appears that v4.1 got rid of Exemplary Performance for this credit. Is that correct? |
|
Who can supply Potable water analysis results?NC-v4 WEc3: Cooling tower water useposted by Alex Edwards on Apr 17, 2022, 10:44 pm
Hello, We are performing the credit Cooling Tower Water Use and our MEP contractor can supply the Potable water analysis results. Is this possible because we only read "... Last reply: Maeve Donohue, May 5, 2022, 12:18 pm |
|
ceiling suspension systemsNC-v4.1 EQc2: Low-emitting materialsposted by Erin Holdenried on May 4, 2022, 12:21 pm
Are ACT suspension systems considered inherently non-emitting? Last reply: Emily Purcell, May 4, 2022, 4:32 pm |
|
Bird collision deterrence- corrective actionsPilot-Credits SSpc55: Bird collision deterrenceposted by Zuzanna Targosz on Jan 25, 2022, 10:00 am
What corrective actions could be implemented in case of noticing birds collisions in spite of low BCTR value? Last reply: Stefan Knust, May 4, 2022, 10:35 am |
|
Print rooms.CI-v4 EQc1: Enhanced indoor air quality strategiesposted by R Jones on Jan 20, 2022, 5:09 am
Our project is intending on containing 2x multifunctional printers within a glass partitioned area (large floor plate so there will be a couple of these on each floor). These printers will be... Last reply: emily reese moody, May 4, 2022, 9:56 am |
|
Green Cleaning- Equipment- Vacuum CleanerEBOM-v4 EQc8: Green cleaning - equipmentposted by DINGTIAN OU on May 4, 2022, 6:43 am
Do all vacuum cleaners certified by the Carpet and Rug Institute Seal of Approval (... |
|
Airport base ratio?NC-v4 LTc7: Reduced parking footprintposted by Bouygues Sustainability on Jan 23, 2017, 10:11 am
Hello - how do i calculate the baseline parking capacity of an airport ? - it is not included in the TABLE 1 - Base Ratios for parking spaces, by building type. Last reply: Chris Flint Chatto, May 3, 2022, 4:28 pm |
|
Clean cleaning using Option 2. Certified cleaning service for LEED v4, ID+C as IN creditCI-v4 INc1: Innovationposted by Courtney Royal on Oct 30, 2020, 9:27 am
Is it enough to pursue the... Last reply: emily reese moody, May 3, 2022, 12:43 pm |
|
T Frame for drop down ceiling tilesNC-v4.1 EQc2: Low-emitting materialsposted by Peter Downar on Jan 13, 2022, 3:52 pm
Would the metal framing be included in the ceilings section for the calculator or not included because its inherently non emitting? Last reply: Erin Holdenried, May 2, 2022, 4:52 pm |